[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":656},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,7,50,1135,[13,34,46,64,76,88,103,118,130,145,153,165,179,191,205,217,229,241,253,265,280,294,306,321,336,348,362,374,385,400,412,424,432,447,462,472,487,499,511,519,533,548,556,568,580,592,604,618,627,641],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},941010,1,"单选题","对企业投资项目申请书进行核准评估时，不需要评估的内容是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","申报单位是否具备承担项目的能力",false,{"key":24,"text":25,"correct":22},"B","拟建项目是否符合行业准入标准",{"key":27,"text":28,"correct":22},"C","拟建项目是否对行业发展、区域经济产生影响",{"key":30,"text":31,"correct":32},"D","项目建设及运营模式是否与企业发展战略相适应",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},941011,"关于项目评估质量控制的说法，正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目评估质量控制的目的是确保咨询项目通过评审",{"key":24,"text":41,"correct":22},"项目评估质量控制工作的第一步是验收顾客提供的资料",{"key":27,"text":43,"correct":22},"项目评估质量控制的流程的最终环节是组织专家评审",{"key":30,"text":45,"correct":32},"项目评估质量控制的工作重点之一是配备合格的项目经理",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},941014,2,"多选题","下列项目评估内容中，属于债权人重点关注内容的有（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"项目资源配置的合理性",{"key":24,"text":55,"correct":32},"项目融资主体的盈利能力",{"key":27,"text":57,"correct":22},"项目的技术来源",{"key":30,"text":59,"correct":22},"项目的社会影响",{"key":61,"text":62,"correct":32},"E","项目的偿债能力","BE",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":30,"analysis":33},941015,"对企业申请中央预算内投资补助的资金申请报告进行评估时，不需要评估的内容为（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":22},"是否符合中央预算内投资使用的方向",{"key":24,"text":71,"correct":22},"是否符合投资补助安排的原则",{"key":27,"text":73,"correct":22},"是否基本落实主要建设条件",{"key":30,"text":75,"correct":32},"政府补贴的资金数额",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":27,"analysis":33},941016,"项目评估的内容和侧重点依委托主体的不同而有所差别。政府部门委托咨询评估的项目，一般侧重于（ ） 。",[80,82,84,86],{"key":20,"text":81,"correct":22},"项目的财务效益和财务风险",{"key":24,"text":83,"correct":22},"项目的偿债能力和可持续性",{"key":27,"text":85,"correct":32},"项目的经济和社会影响分析",{"key":30,"text":87,"correct":22},"项目的资金来源和资金成本",{"id":89,"libraryId":5,"type":48,"typeLabel":49,"stem":90,"options":91,"answer":102,"analysis":33},941017,"下列关于项目评估阶段的表述，正确的有()。",[92,94,96,98,100],{"key":20,"text":93,"correct":32},"项目评估是工程咨询机构接受政府、企业委托，对可行性研究报告等进行评估论证",{"key":24,"text":95,"correct":32},"项目评估要提出明确的评估结论和提供咨询意见建议",{"key":27,"text":97,"correct":22},"项目评估提出的评估意见只为政府审批决策提供依据",{"key":30,"text":99,"correct":22},"项目建议书阶段不需要进行项目评估",{"key":61,"text":101,"correct":22},"项目评估不涉及拟建项目本身","AB",{"id":104,"libraryId":5,"type":48,"typeLabel":49,"stem":105,"options":106,"answer":117,"analysis":33},941018,"政府规划评估主要包括()。",[107,109,111,113,115],{"key":20,"text":108,"correct":32},"产业规划",{"key":24,"text":110,"correct":32},"园区规划",{"key":27,"text":112,"correct":32},"专项规划",{"key":30,"text":114,"correct":22},"整体规划",{"key":61,"text":116,"correct":22},"企业委托评估","ABC",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},941019,"项目核准机关委托的评估主要是对()进行评估。",[122,124,126,128],{"key":20,"text":123,"correct":32},"企业投资项目申请报告",{"key":24,"text":125,"correct":22},"企业投资项目申请政府投资补助项目资金申请报告",{"key":27,"text":127,"correct":22},"需要履行审批手续的政府直接投资项目的项目建议书",{"key":30,"text":129,"correct":22},"需要履行审批手续的政府资本金注入项目的项目建议书",{"id":131,"libraryId":5,"type":48,"typeLabel":49,"stem":132,"options":133,"answer":144,"analysis":33},941020,"不同的委托主体，对评估的内容及侧重点的要求有所不同。企业委托的评估项目，重点评估()。",[134,136,138,140,142],{"key":20,"text":135,"correct":32},"产品的竞争力",{"key":24,"text":137,"correct":32},"项目资金的流动性",{"key":27,"text":139,"correct":22},"项目的社会影响评价",{"key":30,"text":141,"correct":22},"融资主体的清偿能力评价",{"key":61,"text":143,"correct":32},"项目的盈利能力和财务风险","ABE",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":20,"analysis":33},941021,"项目核准机关委托的评估主要是对（ ）进行评估。",[149,150,151,152],{"key":20,"text":123,"correct":32},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":22},{"key":30,"text":129,"correct":22},{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},941022,"政府和社会资本合作(PPP)项目中物有所值的定性评价，一般采用()",[157,159,161,163],{"key":20,"text":158,"correct":22},"性价比法",{"key":24,"text":160,"correct":22},"综合评分法",{"key":27,"text":162,"correct":32},"专家打分法",{"key":30,"text":164,"correct":22},"经评审的最低投标价法",{"id":166,"libraryId":5,"type":48,"typeLabel":49,"stem":167,"options":168,"answer":117,"analysis":33},941024,"下列策略或做法中，符合政府与社会资本合作（PPP）项目实施方案编制应遵循的原则有()。",[169,171,173,175,177],{"key":20,"text":170,"correct":32},"尊重契约精神",{"key":24,"text":172,"correct":32},"统筹近期和远期关系",{"key":27,"text":174,"correct":32},"宏观和微观相结合",{"key":30,"text":176,"correct":22},"政府资本优先获利",{"key":61,"text":178,"correct":22},"政府承担项目市场风险",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":20,"analysis":33},941029,"下列建设项目中，仅从项目类型上考虑，最适宜采用政府和社会资本合作（PPP）模式建设的是()。",[183,185,187,189],{"key":20,"text":184,"correct":32},"某二线城市的综合管廊建设项目",{"key":24,"text":186,"correct":22},"某化工企业的改扩建工程",{"key":27,"text":188,"correct":22},"某房地产开发企业拟建设的度假村项目",{"key":30,"text":190,"correct":22},"某自来水厂的技术改造项目",{"id":192,"libraryId":5,"type":48,"typeLabel":49,"stem":193,"options":194,"answer":117,"analysis":33},941030,"政府和社会资本合作(PPP)项目物有所值评价中，政府方净成本的现值(PPP 值)等同于政府和社会资本合作(PPP)项目全生命周期内()、配套投入等各项财政支出责任的现值。",[195,197,199,201,203],{"key":20,"text":196,"correct":32},"股权投资",{"key":24,"text":198,"correct":32},"运营补贴",{"key":27,"text":200,"correct":32},"风险承担",{"key":30,"text":202,"correct":22},"财政承受能力",{"key":61,"text":204,"correct":22},"竞争性中立调整",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":24,"analysis":33},941031,"根据《政府和社会资本合作项目财政承受能力论证指引》，在财政承受能力评估时，政府年度财政预算支出中用于政府和社会资本合作（PPP）项目的支出与一般公共预算支出的比例上限是()。",[209,211,213,215],{"key":20,"text":210,"correct":22},"5%",{"key":24,"text":212,"correct":32},"10%",{"key":27,"text":214,"correct":22},"15%",{"key":30,"text":216,"correct":22},"20%",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":30,"analysis":33},941035,"下列指标中，属于政府和社会资本合作（PPP）项目物有所值定性评价基本指标的是()。",[221,223,225,227],{"key":20,"text":222,"correct":22},"项目规模",{"key":24,"text":224,"correct":22},"全生命周期成本",{"key":27,"text":226,"correct":22},"运营收入正常潜力",{"key":30,"text":228,"correct":32},"全生命周期整合程度",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},941036,"政府和社会资本合作（PPP）项目物有所值评价中采用PPP 值和PSC 值进行比较，其中PSC 值的确定一般应参照()。",[233,235,237,239],{"key":20,"text":234,"correct":32},"项目的建设和运营维护净成本、竞争性中立调整值、项目全部风险成本",{"key":24,"text":236,"correct":22},"项目的建设成本、竞争性中立调整值、项目全部风险成本",{"key":27,"text":238,"correct":22},"项目的建设和运营维护净成本、竞争性中立调整值、社会资本的风险成本",{"key":30,"text":240,"correct":22},"项目的建设成本、竞争性中立调整值、政府自留的风险成本",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":20,"analysis":33},941042,"PPP 模式中，下列不属于合作期内履约保证形式的是（ ）。",[245,247,249,251],{"key":20,"text":246,"correct":32},"投标保证金",{"key":24,"text":248,"correct":22},"项目前期履约保证",{"key":27,"text":250,"correct":22},"运营期履约保证",{"key":30,"text":252,"correct":22},"移交保证",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":27,"analysis":33},941043,"PPP 模式通常模式是由（ ）承担设计、建设、运营、维护基础设施的大部分工作，并通过“使用者付费”及必要的“政府付费”获得合理投资回报。",[257,259,261,263],{"key":20,"text":258,"correct":22},"政府",{"key":24,"text":260,"correct":22},"个人资本",{"key":27,"text":262,"correct":32},"社会资本",{"key":30,"text":264,"correct":22},"国有资金",{"id":266,"libraryId":5,"type":48,"typeLabel":49,"stem":267,"options":268,"answer":279,"analysis":33},941047,"政府和社会资本合作（PPP）项目实施方案中需进行风险识别与分配。风险分配原则包括（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":32},"承担的风险程度与所得回报相匹配的原则",{"key":24,"text":272,"correct":22},"承担风险的一方具有承担风险意愿的原则",{"key":27,"text":274,"correct":32},"承担风险的一方能够将风险合理转移的原则",{"key":30,"text":276,"correct":32},"由对风险最有控制力的一方承担相应风险的原则",{"key":61,"text":278,"correct":22},"社会资本方不愿意承担的风险由政府方承担的原则","ACD",{"id":281,"libraryId":5,"type":48,"typeLabel":49,"stem":282,"options":283,"answer":117,"analysis":33},941048,"政府和社会资本合作（PPP）项目实施方案编制的基本要求有（ ）。",[284,286,288,290,292],{"key":20,"text":285,"correct":32},"科学性",{"key":24,"text":287,"correct":32},"专业性",{"key":27,"text":289,"correct":32},"有效性",{"key":30,"text":291,"correct":22},"时效性",{"key":61,"text":293,"correct":22},"复杂性",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},941049,"()的编制是在项目前期工作成果的基础上，进一步对政府和社会资本合作项目合作的交易结构、合作边界、投融资模式、监管等主要内容进行充分论证。",[298,300,302,304],{"key":20,"text":299,"correct":22},"项目可行性分析",{"key":24,"text":301,"correct":22},"项目建议书",{"key":27,"text":303,"correct":32},"项目实施方案",{"key":30,"text":305,"correct":22},"项目开工报告",{"id":307,"libraryId":5,"type":48,"typeLabel":49,"stem":308,"options":309,"answer":320,"analysis":33},941051,"以下属于政府和社会资本合作（PPP）项目实施方案编制的基本要求（原则）的有（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":32},"坚持风险分担，利益共享",{"key":24,"text":313,"correct":32},"尊重契约精神，建立长期合作关系",{"key":27,"text":315,"correct":32},"维护公共利益，保障社会资本获得合理回报",{"key":30,"text":317,"correct":32},"宏观与微观相结合，统筹近期与远期关系",{"key":61,"text":319,"correct":22},"维护社会利益，保障社会资本获得合理回报","ABCD",{"id":322,"libraryId":5,"type":48,"typeLabel":49,"stem":323,"options":324,"answer":335,"analysis":33},941053,"政府和社会资本投资人的合同体系是前期策划和决策的重点，需要对双方合作的核心边界条件等进行约定。以下属于交易条件边界需约定内容的有()。",[325,327,329,331,333],{"key":20,"text":326,"correct":22},"股权变更机制",{"key":24,"text":328,"correct":22},"应急处理机制",{"key":27,"text":330,"correct":32},"项目回报机制",{"key":30,"text":332,"correct":32},"价格调整机制",{"key":61,"text":334,"correct":22},"临时征用与接管","CD",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},941054,"政府和社会资本合作(PPP)项目运作方式中，()是指由社会资本或项目公司承担新建项目设计、融资、建造、运营、维护和用户服务职责，必须在合同中注明保证公益性的约束条款，社会资本或项目公司长期拥有项目所有权的项目运作方式。",[340,342,344,346],{"key":20,"text":341,"correct":22},"委托运营",{"key":24,"text":343,"correct":22},"建设-运营-移交",{"key":27,"text":345,"correct":32},"建设-拥有-运营",{"key":30,"text":347,"correct":22},"转让-运营-移交",{"id":349,"libraryId":5,"type":48,"typeLabel":49,"stem":350,"options":351,"answer":117,"analysis":33},941055,"政府和社会资本合作(PPP)项目实施方案编制过程中，需要结合()原则提出投资人类型的选择建议。",[352,354,356,358,360],{"key":20,"text":353,"correct":32},"充分考虑政府方意愿",{"key":24,"text":355,"correct":32},"尊重项目实际",{"key":27,"text":357,"correct":32},"高度重视社会资本方需求",{"key":30,"text":359,"correct":22},"承担的风险程度与所得回报相匹配",{"key":61,"text":361,"correct":22},"保障社会资本获得合理回报",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},941056,"下列选项中，属于回报机制政府付费项目的是()。",[366,368,370,372],{"key":20,"text":367,"correct":32},"市政绿化项目",{"key":24,"text":369,"correct":22},"轨道交通",{"key":27,"text":371,"correct":22},"效益较好的收费公路",{"key":30,"text":373,"correct":22},"城市综合管廊",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},941057,"政府和社会资本合作(PPP)项目原则上政府方股份应低于()，也可以完全不参股项目公司。",[378,380,382,384],{"key":20,"text":379,"correct":32},"50%",{"key":24,"text":381,"correct":22},"51%",{"key":27,"text":383,"correct":22},"30%",{"key":30,"text":216,"correct":22},{"id":386,"libraryId":5,"type":48,"typeLabel":49,"stem":387,"options":388,"answer":399,"analysis":33},941058,"《关于印发政府和社会资本合作模式操作指南(试行)的通知(财金(2014)113 号)中提出，政府付费主要包括()。",[389,391,393,395,397],{"key":20,"text":390,"correct":22},"定额付费",{"key":24,"text":392,"correct":32},"绩效付费",{"key":27,"text":394,"correct":32},"可用性付费",{"key":30,"text":396,"correct":22},"按时长付费",{"key":61,"text":398,"correct":32},"使用量付费","BCE",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},941059,"政府和社会资本投资人的合同体系是()的重点，需要对双方合作的核心边界条件，项目全生命周期不同阶段各方的权利、义务等进行约定。",[404,406,408,410],{"key":20,"text":405,"correct":32},"前期策划和决策",{"key":24,"text":407,"correct":22},"前期策划和实施",{"key":27,"text":409,"correct":22},"准备和实施",{"key":30,"text":411,"correct":22},"实施和建成",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":30,"analysis":33},941060,"政府和社会资本投资人的合同体系是前期策划和决策的重点。以下关于双方权利和义务的说法，错误的是()。",[416,418,420,422],{"key":20,"text":417,"correct":22},"获得政府付费或者使用者付费属于社会资本方的权利",{"key":24,"text":419,"correct":22},"政府方权利包括合作期各个阶段的知情权、监督权、绩效考核等",{"key":27,"text":421,"correct":22},"合作期内，政府只能在合同约定、行政管理许可的情况下进行监管",{"key":30,"text":423,"correct":32},"社会资本必须执行政府方基于公共利益要求而提出增加配套设施建设等特别要求",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},941061,"政府和社会资本合作(PPP)项目中，在遴选社会资本投资人阶段的评分办法应采用()",[428,429,430,431],{"key":20,"text":158,"correct":22},{"key":24,"text":160,"correct":32},{"key":27,"text":162,"correct":22},{"key":30,"text":164,"correct":22},{"id":433,"libraryId":5,"type":48,"typeLabel":49,"stem":434,"options":435,"answer":446,"analysis":33},941062,"物有所值定性基本评价指标包括()。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"项目规模大小",{"key":24,"text":439,"correct":22},"预期使用寿命长短",{"key":27,"text":441,"correct":32},"潜在竞争程度",{"key":30,"text":443,"correct":32},"政府机构能力",{"key":61,"text":445,"correct":32},"可融资性","CDE",{"id":448,"libraryId":5,"type":48,"typeLabel":49,"stem":449,"options":450,"answer":461,"analysis":33},941063,"政府和社会资本合作(PPP)项目物有所值评价中，竞争性中立调整值主要是采用政府传统投资方式比采用政府和社会资本合作(PPP)模式实施项目少支出的费用，通常包括少支出的()。",[451,453,455,457,459],{"key":20,"text":452,"correct":32},"土地费用",{"key":24,"text":454,"correct":22},"建设成本",{"key":27,"text":456,"correct":22},"风险成本",{"key":30,"text":458,"correct":32},"有关税费",{"key":61,"text":460,"correct":32},"行政审批费用","ADE",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},941064,"政府和社会资本合作(PPP)项目物有所值评价中，政府方净成本的现值(PPP 值)与公共部门比较值(PSC 值)进行比较可对等扣除的是()。",[466,467,468,470],{"key":20,"text":458,"correct":22},{"key":24,"text":460,"correct":22},{"key":27,"text":469,"correct":32},"政府自留风险的承担成本",{"key":30,"text":471,"correct":22},"可转移给社会资本的风险承担成本",{"id":473,"libraryId":5,"type":48,"typeLabel":49,"stem":474,"options":475,"answer":486,"analysis":33},941065,"政府和社会资本合作(PPP)项目财政承受能力论证工作包括()。",[476,478,480,482,484],{"key":20,"text":477,"correct":32},"财政承受能力评估",{"key":24,"text":479,"correct":22},"政府机构能力评估",{"key":27,"text":481,"correct":32},"责任识别和支出测算",{"key":30,"text":483,"correct":22},"竞争性中立调整测算",{"key":61,"text":485,"correct":22},"全生命周期整合程度评估","AC",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},941066,"在财政承受能力评估结论形成后，是否需要编制财政承受能力论证报告，由各地方()确定。",[491,493,495,497],{"key":20,"text":492,"correct":22},"财政厅",{"key":24,"text":494,"correct":22},"财政局",{"key":27,"text":496,"correct":32},"管理支付部门",{"key":30,"text":498,"correct":22},"财政部",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},941067,"双方承担风险的意愿不包括()。",[503,505,507,509],{"key":20,"text":504,"correct":22},"对风险的一般态度",{"key":24,"text":506,"correct":22},"对项目风险的认识深度",{"key":27,"text":508,"correct":32},"承担风险的想法",{"key":30,"text":510,"correct":22},"承担风险后果的能力",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":30,"analysis":33},941068,"政府和社会资本合作(PPP)项目实施方案中需进行风险识别与分配。风险分担的首要原则是()。",[515,516,517,518],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":22},{"key":27,"text":274,"correct":22},{"key":30,"text":276,"correct":32},{"id":520,"libraryId":5,"type":48,"typeLabel":49,"stem":521,"options":522,"answer":144,"analysis":33},941069,"一般而言，政府和社会资本合作(PPP)模式中社会资本根据其主要业务类型和投资目的，可分为()。",[523,525,527,529,531],{"key":20,"text":524,"correct":32},"以运营为目的的运营商",{"key":24,"text":526,"correct":32},"以投资为目的的投资型社会资本",{"key":27,"text":528,"correct":22},"以为项目全生命周期服务为目的的服务商",{"key":30,"text":530,"correct":22},"以承揽项目设计为主要目的的设计型社会资本",{"key":61,"text":532,"correct":32},"以承揽项目施工建设为主要目的的施工型社会资本",{"id":534,"libraryId":5,"type":48,"typeLabel":49,"stem":535,"options":536,"answer":547,"analysis":33},941070,"关于政府和社会资本合作（PPP）项目物有所值评价的说法，正确的有()。",[537,539,541,543,545],{"key":20,"text":538,"correct":22},"物有所值评价必须进行定量评价",{"key":24,"text":540,"correct":32},"政府机构能力是物有所值评价内容之一",{"key":27,"text":542,"correct":32},"物有所值评价是判断项目是否采用PPP模式实施的决策基础",{"key":30,"text":544,"correct":32},"定量评价的前提是假定PPP模式和政府传统投资模式的产出绩效相同",{"key":61,"text":546,"correct":22},"物有所值验证只有一次机会，一旦不能通过，就不再采用PPP模式","BCD",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":33},941071,"政府和社会资本合作(PPP)项目中物有所值的定性评价，一般采用()。",[552,553,554,555],{"key":20,"text":158,"correct":22},{"key":24,"text":160,"correct":22},{"key":27,"text":162,"correct":32},{"key":30,"text":164,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},941073,"政府和社会资本合作（PPP）项目物有所值评价中采取PPP值PSC值进行比较，其中PSC值的确定一般应参照（ ）",[560,562,564,566],{"key":20,"text":561,"correct":32},"项目的建设和运营维护净成本，竞争性中立调整值、项目全部风险成本",{"key":24,"text":563,"correct":22},"项目的建设成本，竞争性中立调整值，项目全部风险成本",{"key":27,"text":565,"correct":22},"项目的建设和运营维护净成本，竞争性中立调整值，社会资本的风险成本",{"key":30,"text":567,"correct":22},"项目的建设成本、竞争性中立调整值，政府自留的风险成本",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":27,"analysis":33},941075,"项目评估质量控制的目的，是通过对咨询评估工作中直接影响产品质量的()实施控制，确保咨询评估结论和意见建议的公平公正、科学合理，并符合相关规定要求。",[572,574,576,578],{"key":20,"text":573,"correct":22},"关键工序和关键环节",{"key":24,"text":575,"correct":22},"关键环节和薄弱环节",{"key":27,"text":577,"correct":32},"主要过程和关键环节",{"key":30,"text":579,"correct":22},"主要过程和主要工序",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":30,"analysis":33},941076,"项目评估质量控制的流程中，属于接受委托环节的是()。",[584,586,588,590],{"key":20,"text":585,"correct":22},"聘用专家",{"key":24,"text":587,"correct":22},"选任项目经理",{"key":27,"text":589,"correct":22},"组建项目评估组",{"key":30,"text":591,"correct":32},"指派项目前期负责人",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":30,"analysis":33},941077,"选任项目经理属于项目评估质量控制()环节。",[596,598,600,602],{"key":20,"text":597,"correct":22},"接受委托",{"key":24,"text":599,"correct":22},"组织评估",{"key":27,"text":601,"correct":22},"质量评审",{"key":30,"text":603,"correct":32},"前期准备",{"id":605,"libraryId":5,"type":48,"typeLabel":49,"stem":606,"options":607,"answer":320,"analysis":33},941078,"项目评估质量控制的重点表现在()。",[608,610,612,614,616],{"key":20,"text":609,"correct":32},"配置人力资源",{"key":24,"text":611,"correct":32},"收集待评材料",{"key":27,"text":613,"correct":32},"制订质量计划",{"key":30,"text":615,"correct":32},"建立评审制度",{"key":61,"text":617,"correct":22},"建立分配制度",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":30,"analysis":33},941079,"关于项目评估质量控制的说法，正确的是（ ）",[622,624,625,626],{"key":20,"text":623,"correct":22},"项目评话质量控制的目的是确保咨询项目通过评审",{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":30,"text":45,"correct":32},{"id":628,"libraryId":5,"type":48,"typeLabel":49,"stem":629,"options":630,"answer":399,"analysis":33},941081,"根据《国家发展改革委重大固定资产投资项目社会稳定风险评估暂行办法》，社会稳定风险评估报告的主要内容包括()。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"项目建设实施的必要性",{"key":24,"text":634,"correct":32},"可能引发的社会稳定风险",{"key":27,"text":636,"correct":32},"各方面意见及其采纳情况",{"key":30,"text":638,"correct":22},"风险评估主体的评估程序",{"key":61,"text":640,"correct":32},"风险防范和化解措施以及应急处置预案",{"id":642,"libraryId":5,"type":48,"typeLabel":49,"stem":643,"options":644,"answer":655,"analysis":33},941082,"项目评估是政府、金融机构或建设单位等投资主体进行项目投资决策的重要基础与依据，其作用主要体现在()。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"提高金融机构审批贷款质量，避免项目失误带来的损失",{"key":24,"text":648,"correct":32},"提高投资效益，避免决策失误带来的损失",{"key":27,"text":650,"correct":22},"提高项目前期工作质量，避免重复返工造成的资源浪费",{"key":30,"text":652,"correct":32},"提高项目前期工作质量与效率，避免重复返工造成的资源浪费",{"key":61,"text":654,"correct":32},"提高投资项目决策水平，为投资主体和投资管理部门提供决策依据","BDE",[657,660,663,666,669,672],{"id":15,"name":658,"category":7,"favorite":659},"领导干部任职前廉政法规知识测试题",92,{"id":661,"name":662,"category":7,"favorite":15},595,"建筑结构与设备",{"id":664,"name":665,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":667,"name":668,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":670,"name":671,"category":7,"favorite":8},534,"BIM工程师",{"id":673,"name":671,"category":7,"favorite":8},535]