[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":652},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,6,50,1135,[13,34,46,64,79,94,106,121,133,148,162,174,186,201,213,225,240,251,263,277,292,303,317,328,342,354,366,378,390,401,415,429,437,449,461,473,485,497,509,521,533,541,553,565,577,586,598,610,622,637],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},940952,1,"单选题","关于厂区总平面布置技术经济指标的说法，正确的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工业企业内部绿地率应不低于30%",false,{"key":24,"text":25,"correct":26},"B","—般工业项目建筑系数应不低于30%",true,{"key":28,"text":29,"correct":22},"C","建筑物层高超过7米，计算容积率时该层建筑面积加倍计算",{"key":31,"text":32,"correct":22},"D","工业项目行政办公及生活服务设施用地所占比重不得超过8%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},940954,"在项目建设方案设计中，对项目建设规模应进行合理性分析，考虑建设规模合理性的首要因素是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"收益的合理性",{"key":24,"text":41,"correct":22},"资源利用的合理性",{"key":28,"text":43,"correct":22},"外部条件的适应性与匹配性",{"key":31,"text":45,"correct":26},"产业政策和行业特点的符合性",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},940956,2,"多选题","以下关于危险废物贮存设施的选址与设计要求，正确的有()。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"设施底部必须高于地下水最高水位1.5m",{"key":24,"text":55,"correct":26},"应位于居民中心区常年最大风频的下风向",{"key":28,"text":57,"correct":22},"地质结构稳定，地震烈度不超过9度的区域内",{"key":31,"text":59,"correct":22},"应优先选用废弃的采矿坑、塌陷区",{"key":61,"text":62,"correct":26},"E","应避免建在溶洞区或易遭受严重自然灾害影响的地区","BE",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":78,"analysis":33},940957,"下列评价指标中，属于投资方案经济效果静态评价指标的有()。",[68,70,72,74,76],{"key":20,"text":69,"correct":22},"内部收益率",{"key":24,"text":71,"correct":26},"利息备付率",{"key":28,"text":73,"correct":26},"投资收益率",{"key":31,"text":75,"correct":26},"资产负债率",{"key":61,"text":77,"correct":22},"净现值率","BCD",{"id":80,"libraryId":5,"type":48,"typeLabel":49,"stem":81,"options":82,"answer":93,"analysis":33},940958,"下列建设项目总图布局要求中，属于竖向布置要求的有()。",[83,85,87,89,91],{"key":20,"text":84,"correct":26},"保证场地不内涝",{"key":24,"text":86,"correct":22},"尽量集中紧凑布置",{"key":28,"text":88,"correct":26},"尽量避免深挖高填",{"key":31,"text":90,"correct":26},"合理利用高程和坡度",{"key":61,"text":92,"correct":22},"合理确定厂区通道宽度","ACD",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},940959,"某项目厂区总用地面积为 48000m2，建（构）筑物占地面积 12000m2，露天堆场占地面积 2400m2，道路及广场占地面积 16000m2，绿化面积 2000m2，地上、地下工程管线占地面积 3000m2，总建筑面积57600m2，固定资产投资 11040 万元，行政办公、生活服务设施占用土地面积 2400m2，则该项目的容积率为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"0.25",{"key":24,"text":101,"correct":22},"4",{"key":28,"text":103,"correct":22},"0.83",{"key":31,"text":105,"correct":26},"1.2",{"id":107,"libraryId":5,"type":48,"typeLabel":49,"stem":108,"options":109,"answer":120,"analysis":33},940961,"下列因素中，属于确定项目建设规模时应考虑的主要因素有（ ）。",[110,112,114,116,118],{"key":20,"text":111,"correct":22},"项目组织与实施机构的组成",{"key":24,"text":113,"correct":26},"市场容量和竞争力",{"key":28,"text":115,"correct":26},"环境容量和自然资源供应量",{"key":31,"text":117,"correct":26},"技术条件",{"key":61,"text":119,"correct":26},"经济社会条件","BCDE",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":31,"analysis":33},940962,"厂址选择时往往考虑集中布局所带来的集聚效应。关于集中布局的说法，错误的是（ ）。",[125,127,129,131],{"key":20,"text":126,"correct":22},"集中布局有利于“公用工程岛”的建设",{"key":24,"text":128,"correct":22},"集中布局有利于“三废”的综合治理",{"key":28,"text":130,"correct":22},"集中布局可以降低动力供应成本",{"key":31,"text":132,"correct":26},"集中布局会提高项目建设投资",{"id":134,"libraryId":5,"type":48,"typeLabel":49,"stem":135,"options":136,"answer":147,"analysis":33},940963,"总图运输方案比选的内容有（ ）。",[137,139,141,143,145],{"key":20,"text":138,"correct":26},"技术指标比选",{"key":24,"text":140,"correct":26},"总图布置费用比选",{"key":28,"text":142,"correct":26},"拆迁方案比选",{"key":31,"text":144,"correct":22},"环保方案比选",{"key":61,"text":146,"correct":22},"建筑结构方案比选","ABC",{"id":149,"libraryId":5,"type":48,"typeLabel":49,"stem":150,"options":151,"answer":78,"analysis":33},940964,"决策分析与评价阶段的厂区道路方案设计的深度要满足（ ）的要求。",[152,154,156,158,160],{"key":20,"text":153,"correct":22},"工艺技术方案设计",{"key":24,"text":155,"correct":26},"土石方量计算",{"key":28,"text":157,"correct":26},"投资估算",{"key":31,"text":159,"correct":26},"总平面布置",{"key":61,"text":161,"correct":22},"绿化布置",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},940965,"某企业享有资金1.8 亿元，有六个独立且可行的项目供选择，其投资额分别2500、3000、3200、4000、4500、4800 万元。为最大程度利用现有资金，进行方案选择时最适宜的方法是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"投资回收期比较法",{"key":24,"text":169,"correct":22},"内部收益率排序法",{"key":28,"text":171,"correct":26},"互斥方案组合法",{"key":31,"text":173,"correct":22},"费用\u002F效益比较法",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},940966,"工业企业内部一般不得安排绿地。但因生产工艺等特殊要求需要安排一定比例绿地的，绿地率不得超过（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"15％",{"key":24,"text":181,"correct":26},"20％",{"key":28,"text":183,"correct":22},"25％",{"key":31,"text":185,"correct":22},"30％",{"id":187,"libraryId":5,"type":48,"typeLabel":49,"stem":188,"options":189,"answer":200,"analysis":33},940967,"关于场（厂）址比选内容的说法，正确的有（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"环境保护条件比较与风向关系不大",{"key":24,"text":193,"correct":26},"建设条件比较表包括厂区地势的内容",{"key":28,"text":195,"correct":26},"投资费用比较表包括临时建筑设施费用",{"key":31,"text":197,"correct":22},"在场（厂）址选择阶段应形成“安全条件论证报告”",{"key":61,"text":199,"correct":26},"运营费用比较需要考虑公用工程的供应方式和价格","BCE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},940968,"关于建设项目方案研究中的原材料与燃料供应方案研究的说法，正确的是()。",[205,207,209,211],{"key":20,"text":206,"correct":26},"原材料供应应进行多方案比选",{"key":24,"text":208,"correct":22},"原材料供应必须明确、可靠",{"key":28,"text":210,"correct":22},"燃料供应只考虑生产工艺所需",{"key":31,"text":212,"correct":22},"利用紧缺资源可不考虑运输风险",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},940969,"下列关于投资项目建设方案比选的方法，正确的是()。",[217,219,221,223],{"key":20,"text":218,"correct":22},"不同类别项目的比选指标基本相同",{"key":24,"text":220,"correct":22},"分项工程的比选范围包括场址选择方案",{"key":28,"text":222,"correct":26},"建设方案比选的指标体系包括环境方面的指标",{"key":31,"text":224,"correct":22},"基础设施类项目的比选侧重社会层面和经济层面",{"id":226,"libraryId":5,"type":48,"typeLabel":49,"stem":227,"options":228,"answer":239,"analysis":33},940970,"下列关于可行性研究中项目建设方案研究内容和任务的说法，正确的有()。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"投资估算是建设方案研究的内容之一",{"key":24,"text":232,"correct":26},"节能节水是建设方案研究的内容之一",{"key":28,"text":234,"correct":22},"建设方案比较必须采用定量分析方法",{"key":31,"text":236,"correct":26},"通过建设方案研究，可以选择合理的建设规模",{"key":61,"text":238,"correct":26},"通过建设方案研究，可以选择性能可靠的生产设备","BDE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},940971,"建设方案研究为项目的()提供依据。",[244,245,247,249],{"key":20,"text":157,"correct":22},{"key":24,"text":246,"correct":22},"融资方案",{"key":28,"text":248,"correct":22},"经济评价",{"key":31,"text":250,"correct":26},"初步设计",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":28,"analysis":33},940972,"下列选项中，属于分项工程方案比选的是()。",[255,257,259,261],{"key":20,"text":256,"correct":22},"总体技术路线",{"key":24,"text":258,"correct":22},"建设规模与产品方案",{"key":28,"text":260,"correct":26},"各生产装置建设方案",{"key":31,"text":262,"correct":22},"主要设备选择方案",{"id":264,"libraryId":5,"type":48,"typeLabel":49,"stem":265,"options":266,"answer":147,"analysis":33},940973,"关于建设方案比选的说法中正确的是()。",[267,269,271,273,275],{"key":20,"text":268,"correct":26},"比选指标体系包括技术层面、经济层面和社会层面",{"key":24,"text":270,"correct":26},"建设方案比选应以可靠、可比的数据为基础",{"key":28,"text":272,"correct":26},"拟比选的建设方案一般要比国内现有的技术先进",{"key":31,"text":274,"correct":22},"公共卫生等部门建设项目其方案比较的主要层面是社会层面和经济层面",{"key":61,"text":276,"correct":22},"建设方案研究与比选的原则要注意技术的可比性原则",{"id":278,"libraryId":5,"type":48,"typeLabel":49,"stem":279,"options":280,"answer":291,"analysis":33},940974,"投资项目可行性研究阶段建设方案研究的主要内容通常包括()。",[281,283,285,287,289],{"key":20,"text":282,"correct":26},"建设规模方案",{"key":24,"text":284,"correct":26},"生产工艺技术方案",{"key":28,"text":286,"correct":22},"资金筹措方案",{"key":31,"text":288,"correct":22},"市场营销方案",{"key":61,"text":290,"correct":26},"总图运输方案","ABE",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},940975,"下列项目可行性研究的内容中，属于建设方案主要内容是()。",[296,297,299,301],{"key":20,"text":157,"correct":22},{"key":24,"text":298,"correct":22},"融资计划",{"key":28,"text":300,"correct":26},"节能方案选择",{"key":31,"text":302,"correct":22},"费用效果分析",{"id":304,"libraryId":5,"type":48,"typeLabel":49,"stem":305,"options":306,"answer":291,"analysis":33},940976,"关于建设方案比选原则的说法，正确的有()。",[307,309,311,313,315],{"key":20,"text":308,"correct":26},"考虑安全性及“三废”的处理",{"key":24,"text":310,"correct":26},"考虑对当地资源的适用性",{"key":28,"text":312,"correct":22},"应选择地区内最先进的技术",{"key":31,"text":314,"correct":22},"应选择财务效益最优的方案",{"key":61,"text":316,"correct":26},"考虑技术性、经济性的同时，还要考虑社会影响和环境影响",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},940977,"关于建设项目可行性研究建设方案比选指标体系的说法，正确的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"竞争类项目仅局限于经济层面比选",{"key":24,"text":324,"correct":22},"公共产品类项目主要采用技术层面比选",{"key":28,"text":326,"correct":26},"环境保护项目方案比选偏重社会层面",{"key":31,"text":218,"correct":22},{"id":329,"libraryId":5,"type":48,"typeLabel":49,"stem":330,"options":331,"answer":200,"analysis":33},940978,"建设项目整体方案的比选内容一般包括（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"公用工程配套设施",{"key":24,"text":335,"correct":26},"场（厂）址选择",{"key":28,"text":337,"correct":26},"建设规模与产品",{"key":31,"text":339,"correct":22},"各车间建设",{"key":61,"text":341,"correct":26},"环境保护",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},940979,"关于内部收益率的说法，错误的是()。",[346,348,350,352],{"key":20,"text":347,"correct":22},"内部收益率适用于独立方案之间的比选",{"key":24,"text":349,"correct":22},"内部收益率不能直接用于互斥方案之间的比选",{"key":28,"text":351,"correct":22},"内部收益率能直接衡量未收回投资的收益率",{"key":31,"text":353,"correct":26},"净现值相等的两个方案，其内部收益率相等",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},940980,"某项目采用试差法计算财务内部收益率，求得i1=15%、i2=18%、i3=20%时所对应的净现值分别为150 万元、30 万元和-10 万元，则该项目的财务内部收益率为()。",[358,360,362,364],{"key":20,"text":359,"correct":22},"17.50%",{"key":24,"text":361,"correct":26},"19.50%",{"key":28,"text":363,"correct":22},"19.69%",{"key":31,"text":365,"correct":22},"20.16%",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},940981,"某项目各年的净现金流量如下表所示。该项目的静态投资回收期约为()年。",[370,372,374,376],{"key":20,"text":371,"correct":22},"1.28",{"key":24,"text":373,"correct":26},"2.73",{"key":28,"text":375,"correct":22},"3.28",{"key":31,"text":377,"correct":22},"3.73",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},940982,"某项目现金流量表(单位：万元)如下： 则该项目的净现值为()万元。",[382,384,386,388],{"key":20,"text":383,"correct":22},"1293.95",{"key":24,"text":385,"correct":26},"1593.95",{"key":28,"text":387,"correct":22},"3750",{"key":31,"text":389,"correct":22},"4380",{"id":391,"libraryId":5,"type":48,"typeLabel":49,"stem":392,"options":393,"answer":400,"analysis":33},940983,"反映投资方案盈利能力的动态评价指标有( )。",[394,395,396,397,398],{"key":20,"text":73,"correct":22},{"key":24,"text":69,"correct":26},{"key":28,"text":77,"correct":26},{"key":31,"text":71,"correct":22},{"key":61,"text":399,"correct":22},"偿债备付率","BC",{"id":402,"libraryId":5,"type":48,"typeLabel":49,"stem":403,"options":404,"answer":200,"analysis":33},940984,"关于投资回收期指标优缺点的说法，正确的有()",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"计算简便，但其包含的经济意义不明确",{"key":24,"text":408,"correct":26},"不能全面反映方案整个计算期内的现金流量",{"key":28,"text":410,"correct":26},"在一定程度上显示了资本的周转速度",{"key":31,"text":412,"correct":22},"可以独立用于投资方案的选择",{"key":61,"text":414,"correct":26},"只考虑投资回收前的经济效果",{"id":416,"libraryId":5,"type":48,"typeLabel":49,"stem":417,"options":418,"answer":63,"analysis":33},940985,"应用净现值指标评价项目经济效果的优越性有()。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"能够直接反映项目单位投资的使用效率",{"key":24,"text":422,"correct":26},"能够全面考虑项目在整个计算期内的经济状况",{"key":28,"text":424,"correct":22},"能够直接说明项目运营期各年的经营成果",{"key":31,"text":426,"correct":22},"能够全面反映项目投资过程的收益程度",{"key":61,"text":428,"correct":26},"能够直接以货币额表示项目的超额盈利水平",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},940986,"投资项目净现值为零时所对应指标的收益率称为()。",[433,434,435,436],{"key":20,"text":71,"correct":22},{"key":24,"text":69,"correct":26},{"key":28,"text":77,"correct":22},{"key":31,"text":399,"correct":22},{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},940987,"下列关于项目盈利能力分析的说法中，不正确的是()。",[441,443,445,447],{"key":20,"text":442,"correct":22},"若财务内部收益率大于等于基准收益率，方案可行",{"key":24,"text":444,"correct":26},"若投资回收期大于等于行业标准投资回收期，方案可行",{"key":28,"text":446,"correct":22},"若财务净现值大于等于零，方案可行",{"key":31,"text":448,"correct":22},"若总投资收益率高于同行业收益率参考值，方案可行",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},940988,"下列关于项目经济评价指标的说法，正确的是()。",[453,455,457,459],{"key":20,"text":454,"correct":22},"投资回收期指标是以净利润抵偿全部投资所需要的时间",{"key":24,"text":456,"correct":22},"静态投资回收期可以全面反映投资项目的经济效果",{"key":28,"text":458,"correct":22},"项目的净现值小于零，意味着项目出现了亏损",{"key":31,"text":460,"correct":26},"内部收益率不是用来计算初始投资收益的指标",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},940989,"关于内部收益率的说法，正确的是()。",[465,467,469,471],{"key":20,"text":466,"correct":26},"内部收益率的经济含义是投资方案占用的尚未回收资金的获利能力，它取决于项目内部",{"key":24,"text":468,"correct":22},"对于具有常规现金流量的方案来说，其内部收益率往往不是唯一的",{"key":28,"text":470,"correct":22},"内部收益率适用于只有现金流入或流出的项目",{"key":31,"text":472,"correct":22},"采用线性内插法计算IRR只适用于具有非常规现金流量的投资方案",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},940990,"作为项目经济效果的评价指标，净现值能够()。",[477,479,481,483],{"key":20,"text":478,"correct":22},"直观反映项目单位投资的使用效率",{"key":24,"text":480,"correct":22},"直接说明项目运营期各年的经营成果",{"key":28,"text":482,"correct":26},"全面考虑项目在整个计算期内的经济状况",{"key":31,"text":484,"correct":22},"全面反映项目项目的收益程度",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},940991,"在投资方案经济效果评价指标体系中，属于静态比率性指标的是()。",[489,491,493,495],{"key":20,"text":490,"correct":22},"利息备付率和净现值率",{"key":24,"text":492,"correct":22},"总投资利润率和净年值率",{"key":28,"text":494,"correct":22},"内部收益率和总投资利润率",{"key":31,"text":496,"correct":26},"投资收益率和偿债备付率",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},940992,"采用投资收益率指标评价投资方案经济效果的特点是()。",[501,503,505,507],{"key":20,"text":502,"correct":26},"指标的经济意义明确，直观",{"key":24,"text":504,"correct":22},"考虑了投资收益的时间因素",{"key":28,"text":506,"correct":22},"容易选择正常生产年份",{"key":31,"text":508,"correct":22},"反映了资本的周转速度",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},940993,"关于采用投资回收期指标进行方案评价的说法，正确的有()。",[513,515,517,519],{"key":20,"text":514,"correct":22},"投资回收期考虑了方案整个寿命期的收益，比较客观",{"key":24,"text":516,"correct":22},"投资回收期小于基准投资回收期是项目可行的充分条件",{"key":28,"text":518,"correct":26},"投资回收期不能反映项目投资回收之后的情况",{"key":31,"text":520,"correct":22},"投资回收期越长，说明项目效益越好",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},940994,"甲、乙两个方案为互斥方案，且两个方案计算期相同。甲方案投资100万元，年经营成本为120万元；乙方案投资120万元，年经营成本为110万元。两个方案同时投入使用，效益相同。若基准投资收益率为5%，用增量投资收益率法选择较优的方案，则()。",[525,527,529,531],{"key":20,"text":526,"correct":22},"应选择甲方案",{"key":24,"text":528,"correct":26},"应选择乙方案",{"key":28,"text":530,"correct":22},"甲、乙方案均可选择",{"key":31,"text":532,"correct":22},"不能确定可选择的方案",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},940995,"某企业享有资金1.8亿元，有六个独立且可行的项目供选择，其投资额分别2500万元、3000万元、3200万元、4000万元、4500万元、4800万元。为最大程度利用现有资金，进行方案选择时最适宜的方法是()。",[537,538,539,540],{"key":20,"text":167,"correct":22},{"key":24,"text":169,"correct":22},{"key":28,"text":171,"correct":26},{"key":31,"text":173,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},940996,"某项目有四个备选方案，各方案计算期相同，己知行业财务基准收益率为8%，各方案的数据见下表： 则该项目的最佳方案是（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":26},"甲",{"key":24,"text":548,"correct":22},"乙",{"key":28,"text":550,"correct":22},"丙",{"key":31,"text":552,"correct":22},"丁",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},940997,"某市政道路项目，由两个备选方案，效果相同，甲方案投资 1150 万元，年维护费用100 万元，寿命期 15 年；乙方案投资 860 万元，年维护费用 180 万元，寿命期 12 年。则该项目方案比选最适宜的方法是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":26},"费用年值法",{"key":24,"text":560,"correct":22},"净现值率法",{"key":28,"text":562,"correct":22},"效益\u002F费用比较法",{"key":31,"text":564,"correct":22},"内部收益率比较大",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},940998,"有甲、乙、丙三个独立项目，寿命期相同，初始投资额、年净收益、净现值见下表，己知行业财务基准收益率为10%，投资人的资金限制为1000 万元，用净现值法选择的项目是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"甲和乙",{"key":24,"text":572,"correct":26},"乙和丙",{"key":28,"text":574,"correct":22},"甲和丙",{"key":31,"text":576,"correct":22},"甲、乙和丙",{"id":578,"libraryId":5,"type":48,"typeLabel":49,"stem":579,"options":580,"answer":78,"analysis":33},940999,"下列评价指标中，属于投资方案经济效果静态评价指标的有（ ）。",[581,582,583,584,585],{"key":20,"text":69,"correct":22},{"key":24,"text":71,"correct":26},{"key":28,"text":73,"correct":26},{"key":31,"text":75,"correct":26},{"key":61,"text":77,"correct":22},{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},941000,"某常规投资项目，当折现率为8%时，财务净现值为320 万元；当折现率为10%时，财务净现值为－160 万元。己知该行业财务基准收益率ic 为12%。关于该项目内部收益率IRR 的说法，正确的是（ ）",[590,592,594,596],{"key":20,"text":591,"correct":22},"可推断IRR＞ic，说明项目可行",{"key":24,"text":593,"correct":26},"可推断IRR＜ic，说明项目不可行",{"key":28,"text":595,"correct":22},"无法推断IRR大小，是否可行需要进一步判断",{"key":31,"text":597,"correct":22},"IRR的大小自主决定",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},941001,"某投资方案计算期现金流量见下表，该投资方案的静态投资回收期为()年。",[602,604,606,608],{"key":20,"text":603,"correct":22},"2.143",{"key":24,"text":605,"correct":26},"3.125",{"key":28,"text":607,"correct":22},"3.143",{"key":31,"text":609,"correct":22},"4.125",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":28,"analysis":33},941002,"当折现率分别取12%、14%和16%时，某项目对应的净现值为221.45 万元、81.75万元和-30.15 万元。则该项目的内部收益率为()。",[614,616,618,620],{"key":20,"text":615,"correct":22},"13.46%",{"key":24,"text":617,"correct":22},"15.17%",{"key":28,"text":619,"correct":26},"15.46%",{"key":31,"text":621,"correct":22},"15.52%",{"id":623,"libraryId":5,"type":48,"typeLabel":49,"stem":624,"options":625,"answer":636,"analysis":33},941005,"关于国家发展改革委委托咨询评估的说法，正确的有()。",[626,628,630,632,634],{"key":20,"text":627,"correct":22},"报国务院审批的发展建设规划不属于国家发展改革委委托评估范畴",{"key":24,"text":629,"correct":22},"由国家发展改革委委托评估的项目，应依据项目性质选择评估大纲",{"key":28,"text":631,"correct":26},"评估机构与项目业主单位存在控股关系时，评估机构应回避",{"key":31,"text":633,"correct":26},"特殊项目的咨询评估任务，国家发展改革委可以通过指定方式确定评估机构",{"key":61,"text":635,"correct":22},"委托评估任务时，应首先根据评估机构在行业内的排名对其进行初始排队","CD",{"id":638,"libraryId":5,"type":48,"typeLabel":49,"stem":639,"options":640,"answer":651,"analysis":33},941009,"项目评估质量控制的流程中，属于前期准备环节的是()。",[641,643,645,647,649],{"key":20,"text":642,"correct":26},"聘用专家",{"key":24,"text":644,"correct":22},"组建专家组",{"key":28,"text":646,"correct":26},"选任项目经理",{"key":31,"text":648,"correct":22},"组建项目评估组",{"key":61,"text":650,"correct":22},"指派项目前期负责人","AC",[653,656,659,662,665,668],{"id":15,"name":654,"category":7,"favorite":655},"领导干部任职前廉政法规知识测试题",92,{"id":657,"name":658,"category":7,"favorite":15},595,"建筑结构与设备",{"id":660,"name":661,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":663,"name":664,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":666,"name":667,"category":7,"favorite":8},534,"BIM工程师",{"id":669,"name":667,"category":7,"favorite":8},535]