[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":645},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,21,50,1135,[13,34,52,67,82,97,109,121,133,145,157,169,181,193,204,216,228,240,252,264,276,288,300,312,324,336,348,358,370,382,394,406,418,430,442,454,464,473,485,497,509,523,538,553,567,579,591,606,618,630],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},941814,1,"单选题","进行项目的线性盈亏平衡分析应符合一定假设条件。下列关于这些假设条件的说法，错误的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","产量等于销售量",false,{"key":24,"text":25,"correct":22},"B","总成本费用是产量的线性函数",{"key":27,"text":28,"correct":22},"C","销售收入是销售量的线性函数",{"key":30,"text":31,"correct":32},"D","不同产品的负荷率可以各自变化",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},941815,2,"多选题","关于敏感性分析的说法，正确的有（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"敏感性分析通过计算敏感度系数和临界点来确定关键的敏感因素",{"key":24,"text":43,"correct":22},"经验表明，通常应予进行敏感性分析的因素包括建设投资.产出价格.主要投入价格或固定成本",{"key":27,"text":45,"correct":32},"不确定性因素的选取可借鉴项目后评价的经验",{"key":30,"text":47,"correct":32},"敏感性分析中确定不确定因素变化程度一般选择不确定因素变化的百分率",{"key":49,"text":50,"correct":22},"E","通常财务分析的敏感性分析中必选的分析指标是经济净现值","ACD",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},941816,"下列风险应对策略中，属于风险转移对策的有（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":32},"业务对外发包",{"key":24,"text":59,"correct":32},"向保险公司投保",{"key":27,"text":61,"correct":22},"建立应急储备资金",{"key":30,"text":63,"correct":22},"降低技术方案复杂性",{"key":49,"text":65,"correct":32},"合同中增加保证性条款","ABE",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},941817,"关于项目决策分析与评价中项目风险对策的说法，正确的有（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"建立应急储备属于风险接受对策",{"key":24,"text":74,"correct":22},"降低技术方案复杂性的措施属于风险回避对策",{"key":27,"text":76,"correct":22},"可行性研究中彻底改变原设计方案的做法属于风险减轻对策",{"key":30,"text":78,"correct":22},"风险转移把风险管理责任摊给他人，是一种消除风险的措施",{"key":49,"text":80,"correct":32},"在设备采购和施工合同中采用总价合同形式属于风险转移对策","AE",{"id":83,"libraryId":5,"type":36,"typeLabel":37,"stem":84,"options":85,"answer":96,"analysis":33},941818,"下列方法中，可以用于风险识别的方法有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"解析法",{"key":24,"text":89,"correct":32},"德尔菲法",{"key":27,"text":91,"correct":32},"风险评价表法",{"key":30,"text":93,"correct":32},"风险结构分解法",{"key":49,"text":95,"correct":22},"风险概率-影响矩阵法","ABCD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":20,"analysis":33},941819,"风险分析的流程正确的是（ ）。",[101,103,105,107],{"key":20,"text":102,"correct":32},"风险识别→风险估计→风险评价→风险对策",{"key":24,"text":104,"correct":22},"风险估计→风险识别→风险对策→风险评价",{"key":27,"text":106,"correct":22},"风险评价→风险识别→风险评价→风险对策",{"key":30,"text":108,"correct":22},"风险对策→风险识别→风险对策→风险评价",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":24,"analysis":33},941820,"已知某项目设计生产能力为年产 100 万件产品，根据资料分析，估计单位产品价格为 100 元，单位产品可变成本 80 元，全年固定成本为 500 万元，单位产品销售税金及附加的合并税率为 6%，则盈亏平衡生产能力利用率和盈亏平衡单位产品可变成本分别是（ ）。",[113,115,117,119],{"key":20,"text":114,"correct":22},"25%，20元",{"key":24,"text":116,"correct":32},"35.71%，89元",{"key":27,"text":118,"correct":22},"25%，14元",{"key":30,"text":120,"correct":22},"35.71%，14元",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":24,"analysis":33},941821,"某组织5 位专家进行产品需求量预测，预测数据见下表。则需求量预测的期望值是（ ）万件。",[125,127,129,131],{"key":20,"text":126,"correct":22},"51.5",{"key":24,"text":128,"correct":32},"53.4",{"key":27,"text":130,"correct":22},"58",{"key":30,"text":132,"correct":22},"68",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":20,"analysis":33},941822,"风险对照检查表主要用于风险分析程序的（ ）阶段。",[137,139,141,143],{"key":20,"text":138,"correct":32},"风险识别",{"key":24,"text":140,"correct":22},"风险估计",{"key":27,"text":142,"correct":22},"风险评价",{"key":30,"text":144,"correct":22},"风险应对",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},941823,"下列风险分析方法中，不属于专家调查法的是（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"头脑风暴法",{"key":24,"text":152,"correct":32},"风险解析法",{"key":27,"text":154,"correct":22},"风险对照检查表",{"key":30,"text":156,"correct":22},"风险识别调查表",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":20,"analysis":33},941824,"关于风险概率估计的说法，正确的是（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":32},"风险的客观概率可以根据历史统计数据推定",{"key":24,"text":164,"correct":22},"风险的客观概率不能用于完全可重复事件",{"key":27,"text":166,"correct":22},"基于专家经验推断出的概率是客观概率",{"key":30,"text":168,"correct":22},"主观概率估计是在有效数据充足时采用的方法",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":20,"analysis":33},941825,"某项目的产品价格可能出现三种状态值，分别为70 元\u002Ft，80 元\u002Ft 和100 元\u002Ft，经专家估计，各种状态的可能性为30%，60%，10%，则产品价格预测的方差为（ ）。",[173,175,177,179],{"key":20,"text":174,"correct":32},"69",{"key":24,"text":176,"correct":22},"79",{"key":27,"text":178,"correct":22},"44",{"key":30,"text":180,"correct":22},"38",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":24,"analysis":33},941826,"对于项目的有关各方（不同的风险管理主体）可能会有不同的风险，而且对于同一风险因素，对不同主体的影响是不同的甚至是截然相反的，体现了风险的（ ）性质。",[185,187,189,191],{"key":20,"text":186,"correct":22},"阶段性",{"key":24,"text":188,"correct":32},"相对性",{"key":27,"text":190,"correct":22},"特殊性",{"key":30,"text":192,"correct":22},"多样性",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":30,"analysis":33},941827,"投资项目的有关各方可能会有不同的风险；同一风险因素对不同主体的影响也是不同的。这体现了风险的（ ）特征。",[197,199,201,203],{"key":20,"text":198,"correct":22},"客观性",{"key":24,"text":200,"correct":22},"可变性",{"key":27,"text":202,"correct":22},"层次性",{"key":30,"text":188,"correct":32},{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":27,"analysis":33},941828,"风险与不确定性的区别不包括（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":22},"可否量化",{"key":24,"text":211,"correct":22},"可否保险",{"key":27,"text":213,"correct":32},"可否控制",{"key":30,"text":215,"correct":22},"影响大小",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},941829,"关于建设项目风险的说法，正确的是（ ）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"不同阶段的风险基本相同",{"key":24,"text":223,"correct":32},"风险具有客观存在性",{"key":27,"text":225,"correct":22},"投机风险只能带来损失",{"key":30,"text":227,"correct":22},"自然灾害属于特殊风险",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},941830,"关于项目决策分析与评价中项目风险对策的说法，错误的是（ ）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"制定风险对策需要权衡代价与损失",{"key":24,"text":235,"correct":32},"风险防范工作应在项目开工建设时进行",{"key":27,"text":237,"correct":22},"通过可行性研究彻底改变原方案来应对风险的做法属于风险回避",{"key":30,"text":239,"correct":22},"业主与施工方签订总价合同来应对风险的做法属于风险转移",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":24,"analysis":33},941831,"为了应对风险接受，可以采取事先制订好后备措施。一旦项目实际进展情况与计划不同，就需动用后备措施，不包括（ ）。",[244,246,248,250],{"key":20,"text":245,"correct":22},"预备费措施",{"key":24,"text":247,"correct":32},"人员后备措施",{"key":27,"text":249,"correct":22},"进度后备措施",{"key":30,"text":251,"correct":22},"技术后备措施",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},941832,"某项目基本方案的内部收益率为15.3％，当建设投资上升10％时，内部收益率为12.6％，则建设投资的敏感度系数为 （ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"0.27",{"key":24,"text":259,"correct":32},"-1.76",{"key":27,"text":261,"correct":22},"1.26",{"key":30,"text":263,"correct":22},"-0.82",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":20,"analysis":33},941833,"某项目釆用的基准折现率为12%，其基本方案的财务内部收益率为16.2%，现假设投资增加10%时，财务内部收益率为13.9%，则建设投资增加10%的敏感性系数是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":32},"-1.42",{"key":24,"text":271,"correct":22},"-0.16",{"key":27,"text":273,"correct":22},"0.16",{"key":30,"text":275,"correct":22},"1.58",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":24,"analysis":33},941834,"下列有关敏感性分析的方法说法正确的是（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"敏感性分析通常是改变一种不确定因素的数值",{"key":24,"text":283,"correct":32},"敏感性分析包括单因素敏感性分析和多因素敏感性分析",{"key":27,"text":285,"correct":22},"为了找出关键的敏感性因素，通常进行多因素敏感性分析",{"key":30,"text":287,"correct":22},"敏感性分析选取的效益指标只能是内部收益率",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":30,"analysis":33},941835,"关于敏感性分析的说法，正确的是（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"敏感性分析仅适用于财务分析",{"key":24,"text":295,"correct":22},"敏感程度表明了敏感因素发生的概率",{"key":27,"text":297,"correct":22},"敏感度系数与不确定因素的变化率无关",{"key":30,"text":299,"correct":32},"多因素敏感性分析是对同时改变两个或两个以上因素的情况进行分析",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":27,"analysis":33},941836,"项目决策分析与评价中，不确定性分析采用的主要方法是（ ）。",[304,306,308,310],{"key":20,"text":305,"correct":22},"回归分析",{"key":24,"text":307,"correct":22},"概率树分析",{"key":27,"text":309,"correct":32},"敏感性分析",{"key":30,"text":311,"correct":22},"蒙特卡洛模拟分析",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},941837,"充分利用（ ）的成果，建立风险管理系统，有助于为项目全过程风险管理打下基础，防范和规避项目实施和经营中的风险。",[316,318,320,322],{"key":20,"text":317,"correct":22},"识别风险",{"key":24,"text":319,"correct":32},"风险分析",{"key":27,"text":321,"correct":22},"经济分析",{"key":30,"text":323,"correct":22},"费用效果分析",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":30,"analysis":33},941838,"项目发起人和投资者应积极参与和协助进行风险对策研究，并真正重视风险对策研究的结果，这属于风险对策基本要求中的（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"风险对策应具可行性",{"key":24,"text":331,"correct":22},"风险对策研究应贯穿于可行性研究的全过程",{"key":27,"text":333,"correct":22},"风险对策应具经济性",{"key":30,"text":335,"correct":32},"风险对策研究是项目有关各方的共同任务",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},941839,"风险的影响可以分为五个等级，一旦发生，将导致整个项目的标值严重下降的是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"严重影响",{"key":24,"text":343,"correct":32},"较大影响",{"key":27,"text":345,"correct":22},"中等影响",{"key":30,"text":347,"correct":22},"较小影响",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":30,"analysis":33},941840,"可行性研究中风险对策研究的基本要求不包括（ ）。",[352,353,355,356],{"key":20,"text":331,"correct":22},{"key":24,"text":354,"correct":22},"风险对策应具针对性",{"key":27,"text":333,"correct":22},{"key":30,"text":357,"correct":32},"促使项目获得成功",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},941841,"关于风险分析的说法，正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"风险分析的流程为风险估计.风险识别.风险评价.风险应对",{"key":24,"text":365,"correct":32},"较大影响的风险一旦发生，将导致整个项目的目标值严重下降",{"key":27,"text":367,"correct":22},"概率一影响风险评价矩阵中位于右上角的因素发生概率大但影响小",{"key":30,"text":369,"correct":22},"较低的风险概率范围为41%～60%",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},941842,"在项目决策分析与评价的风险概率一影响矩阵中（横坐标为概率，自左到右由小到大排序；纵坐标为风险因素影响程度，自下向上由小到大排序）,发生概率小但对项目影响大的风险因素位于矩阵的（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"左上角",{"key":24,"text":377,"correct":22},"右上角",{"key":27,"text":379,"correct":22},"左下角",{"key":30,"text":381,"correct":22},"右下角",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},941843,"关于项目敏感性分析中敏感度系数的说法，正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"敏感度系数趋于零，表示不确定因素的发生概率低",{"key":24,"text":389,"correct":32},"敏感度系数大于零，表示评价指标与不确定因素同方向变化",{"key":27,"text":391,"correct":22},"敏感度系数的计算结果与不确定因素的变化率无关",{"key":30,"text":393,"correct":22},"计算敏感度系数的目的是找出不确定因素的极限变化",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},941844,"彻底规避风险，断绝风险来源的风险对策是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"风险减轻",{"key":24,"text":401,"correct":22},"风险转移",{"key":27,"text":403,"correct":22},"风险自担",{"key":30,"text":405,"correct":32},"风险回避",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},941845,"某项目实施时，为保障安全，要求所有进场人员佩戴安全防护装备，该要求施行的是风险（ ）策略。",[410,412,414,416],{"key":20,"text":411,"correct":22},"回避",{"key":24,"text":413,"correct":32},"减轻",{"key":27,"text":415,"correct":22},"转移",{"key":30,"text":417,"correct":22},"接受",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},941846,"将风险分为纯风险和投机风险是按照（ ）进行分类的。",[422,424,426,428],{"key":20,"text":423,"correct":22},"风险的边界划分",{"key":24,"text":425,"correct":32},"风险的性质",{"key":27,"text":427,"correct":22},"风险的影响范围",{"key":30,"text":429,"correct":22},"风险的独立性",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":30,"analysis":33},941847,"关于风险率估计的说法，正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"主观概率估计只能用于完全可重复事件",{"key":24,"text":437,"correct":22},"标准差是描述风险变量偏离期望值程度的相对指标",{"key":27,"text":439,"correct":22},"离散系数是描述风险变量偏离期望值程度的绝对指标",{"key":30,"text":441,"correct":32},"离散型概率分布适用于变量取值个数有限的输入变量",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},941848,"关于蒙特卡洛模拟风险分析方法的说法，错误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":32},"该方法属于风险分析的理论计算法",{"key":24,"text":449,"correct":22},"变量分解程度低，则模拟可靠度降低",{"key":27,"text":451,"correct":22},"该方法可以用于对连续随机变量的分析",{"key":30,"text":453,"correct":22},"变量分解过细往往造成变量之间有相关性",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},941849,"具有系统、全面、简单、快捷、高效等优点，容易集中专家智慧和意见，不容易遗漏主要风险，对风险分析人员有启发思路、开拓思路的作用的风险分析方法是（ ）。",[458,460,462,463],{"key":20,"text":459,"correct":22},"风险解析",{"key":24,"text":461,"correct":22},"专家调查",{"key":27,"text":156,"correct":22},{"key":30,"text":154,"correct":32},{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},941850,"风险分析的程序中，第三个阶段是（ ）。",[468,469,470,471],{"key":20,"text":138,"correct":22},{"key":24,"text":140,"correct":22},{"key":27,"text":142,"correct":32},{"key":30,"text":472,"correct":22},"风险对策",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":27,"analysis":33},941851,"下列有关盈亏平衡分析的说法不正确的是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"盈亏平衡分析根据到达设计生产能力时的数据计算",{"key":24,"text":480,"correct":22},"项目决策分析与评价中一般只进行线性盈亏平衡分析",{"key":27,"text":482,"correct":32},"盈亏平衡点上，销售收入等于总成本费用",{"key":30,"text":484,"correct":22},"盈亏平衡点可以用产品售价来表示",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},941852,"某项目的设计生产能力为年产 800 万件产品，达产后的固定成本为 6500 万元，年可变成本为 3000万元，年销售收入为 13000 万元，年销售税金及附加为 345 万元，销售收入和成本费用均采用不含税价格。该项目年利润达到 2000 万元时的最低年产量为（ ）万件。",[489,491,493,495],{"key":20,"text":490,"correct":22},"507.1",{"key":24,"text":492,"correct":22},"680.0",{"key":27,"text":494,"correct":32},"704.3",{"key":30,"text":496,"correct":22},"707.6",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},941853,"在对盈亏平衡点分析时，盈亏平衡点应按项目（ ）计算，否则就失去了意义。",[501,503,505,507],{"key":20,"text":502,"correct":32},"达产年份的数据",{"key":24,"text":504,"correct":22},"计算期内的平均值",{"key":27,"text":506,"correct":22},"计算期内的最小值",{"key":30,"text":508,"correct":22},"计算期内的最大值",{"id":510,"libraryId":5,"type":36,"typeLabel":37,"stem":511,"options":512,"answer":96,"analysis":33},941854,"经验表明，对建设项目应予以进行敏感性分析的因素包括（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":32},"产出品价格",{"key":24,"text":516,"correct":32},"人民币汇率",{"key":27,"text":518,"correct":32},"建设期",{"key":30,"text":520,"correct":32},"可变成本",{"key":49,"text":522,"correct":22},"固定成本",{"id":524,"libraryId":5,"type":36,"typeLabel":37,"stem":525,"options":526,"answer":537,"analysis":33},941855,"根据对项目不同方案的敏感性分析，下列说法正确的有（ ）。",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"敏感分析图纵轴为不确定因素的变化率",{"key":24,"text":530,"correct":22},"敏感分析图横轴为内部收益率的数值",{"key":27,"text":532,"correct":22},"项目对应因素的与纵轴的交点即为该因素临界值",{"key":30,"text":534,"correct":32},"项目敏感程度小，抗风险能力强",{"key":49,"text":536,"correct":32},"敏感度系数为负表明效益指标与因素变化方向相反","DE",{"id":539,"libraryId":5,"type":36,"typeLabel":37,"stem":540,"options":541,"answer":552,"analysis":33},941856,"线性盈亏平衡分析的条件不包括（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"当年生产的产品（扣除自用量）当年销售出去",{"key":24,"text":545,"correct":32},"产量变化，可变成本不变",{"key":27,"text":547,"correct":22},"产量变化，产品售价不变",{"key":30,"text":549,"correct":32},"产量变化，固定成本不变",{"key":49,"text":551,"correct":22},"只生产单一产品或者可以换算为单一产品计算","BD",{"id":554,"libraryId":5,"type":36,"typeLabel":37,"stem":555,"options":556,"answer":537,"analysis":33},941857,"下列指标中，可用于表示盈亏平衡点的指标通常有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"内部收益率",{"key":24,"text":560,"correct":22},"资产负债率",{"key":27,"text":562,"correct":22},"总投资收益率",{"key":30,"text":564,"correct":32},"产品销售价格",{"key":49,"text":566,"correct":32},"生产能力利用率",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":27,"analysis":33},941858,"项目的经济影响主要通过（ ）体现出来。",[571,573,575,577],{"key":20,"text":572,"correct":22},"行业及部门.区域和宏观经济两个层次",{"key":24,"text":574,"correct":22},"项目.行业及部门.区域和宏观经济三个层次",{"key":27,"text":576,"correct":32},"个人.社会组织.行业及部门.区域和宏观经济四个层次",{"key":30,"text":578,"correct":22},"个人.项目.社会组织.行业及部门.区域和宏观经济五个层次",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},941859,"关于私人投资决策，说法正确的是（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":32},"企业投资决策取决于决策者的风险偏好",{"key":24,"text":586,"correct":22},"风险热爱型投资者一般采取期望值决策准则",{"key":27,"text":588,"correct":22},"风险中性者一般选择最小损失决策准则",{"key":30,"text":590,"correct":22},"风险厌恶型投资者一般采取最大盈利决策准则",{"id":592,"libraryId":5,"type":36,"typeLabel":37,"stem":593,"options":594,"answer":605,"analysis":33},941860,"关于概率树分析的说法，正确的有（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":22},"通常假定输入变量之间是相关的",{"key":24,"text":598,"correct":22},"净现值小于零的概率越接近1，风险越小",{"key":27,"text":600,"correct":32},"净现值期望值为各加权净现值之和",{"key":30,"text":602,"correct":32},"该方法不适于输入变量存在相互关联的情况",{"key":49,"text":604,"correct":22},"评价指标通常按由大到小的顺序排列计算累计概率","CD",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},941861,"某建设项目以财务净现值为指标进行敏感性分析的有关数据如下表所示（单位万元），则按净现值确定的敏感程度由大到小的顺序为（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":22},"①-②-③",{"key":24,"text":613,"correct":32},"②-①-③",{"key":27,"text":615,"correct":22},"②-③-①",{"key":30,"text":617,"correct":22},"③-②-①",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":30,"analysis":33},941862,"某企业投资项目的目标之一是延长产品生产链，提高产品附加值，该目标属于项目具体目标中的（ ）。",[622,624,626,628],{"key":20,"text":623,"correct":22},"宏观目标",{"key":24,"text":625,"correct":22},"规模目标",{"key":27,"text":627,"correct":22},"市场目标",{"key":30,"text":629,"correct":32},"功能目标",{"id":631,"libraryId":5,"type":36,"typeLabel":37,"stem":632,"options":633,"answer":644,"analysis":33},941863,"下列关于初步可行性研究的说法，错误的是（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":32},"初步可行性研究报告是项目决策的依据",{"key":24,"text":637,"correct":22},"政府投资项目，允许初步可行性研究报告代替项目建议书",{"key":27,"text":639,"correct":32},"初步可行性研究的主要目的是论证项目建设的必要性和可行性",{"key":30,"text":641,"correct":22},"初步可行性研究的深度介于投资机会研究和可行性研究之间",{"key":49,"text":643,"correct":22},"项目建议书与初步可行性研究报告之间的差别，主要是对研究成果具体阐述的详略","AC",[646,649,652,655,658,661],{"id":15,"name":647,"category":7,"favorite":648},"领导干部任职前廉政法规知识测试题",92,{"id":650,"name":651,"category":7,"favorite":15},595,"建筑结构与设备",{"id":653,"name":654,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":656,"name":657,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":659,"name":660,"category":7,"favorite":8},534,"BIM工程师",{"id":662,"name":660,"category":7,"favorite":8},535]