[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":649},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,17,50,1135,[13,38,53,68,82,96,108,120,128,143,154,169,183,195,207,219,227,239,251,262,274,289,303,318,330,341,353,365,377,389,401,413,422,434,448,463,478,491,505,517,529,541,551,566,580,589,601,613,625,637],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},941612,2,"多选题","常用的回报机制及适用条件主要包括（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","使用者付费",true,{"key":24,"text":25,"correct":22},"B","政府付费",{"key":27,"text":28,"correct":29},"C","可行性缺口补助",false,{"key":31,"text":32,"correct":22},"D","使用者付费+可行性缺口补助",{"key":34,"text":35,"correct":29},"E","使用者付费+政府付费","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},941613,"PPP 项目实施方案的原则包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"科学性",{"key":24,"text":45,"correct":22},"专业性",{"key":27,"text":47,"correct":22},"有效性",{"key":31,"text":49,"correct":29},"时效性",{"key":34,"text":51,"correct":29},"执行性","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},941614,"PPP 项目实施方案中对于存量项目，技术经济指标依据主要有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"项目前期立项.决策文件及其相关规划",{"key":24,"text":60,"correct":29},"同类项目相关数据资料及业内专家的相关建议",{"key":27,"text":62,"correct":22},"项目日常运营的各项指标.数据记录，或者对现有设施设备的评估.尽职调查",{"key":31,"text":64,"correct":22},"项目历史存档的立项.可行性研究.初步设计.施工图等",{"key":34,"text":66,"correct":22},"周边区域同类项目相关资料的收集.调研.访谈","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},941615,"下列策略或做法中、符合政府与社会资本合作（PPP）项目实施方案编制应遵循的原则有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"尊重契约精神",{"key":24,"text":75,"correct":22},"统筹近期和远期关系",{"key":27,"text":77,"correct":22},"宏观和微观相结合",{"key":31,"text":79,"correct":29},"政府资本优先获利",{"key":34,"text":81,"correct":29},"政府承担项目市场风险",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":27,"analysis":37},941616,1,"单选题","政府和社会资本合作（PPP）项目实施方案中需进行风险识别与分配。对于前期工作深度较浅、工程施工难度较大的项目，（ ）风险较大。",[88,90,92,94],{"key":20,"text":89,"correct":29},"经济",{"key":24,"text":91,"correct":29},"管理",{"key":27,"text":93,"correct":22},"投资控制",{"key":31,"text":95,"correct":29},"运营维护",{"id":97,"libraryId":5,"type":84,"typeLabel":85,"stem":98,"options":99,"answer":20,"analysis":37},941617,"在政府和社会资本合作（PPP）模式中，政府和社会资本建立并维持长期合作伙伴关系的基础是（ ）。",[100,102,104,106],{"key":20,"text":101,"correct":22},"风险分担、利益共享",{"key":24,"text":103,"correct":29},"股权合作、服务供给",{"key":27,"text":105,"correct":29},"股权合作、利益共享",{"key":31,"text":107,"correct":29},"风险分担、服务共享",{"id":109,"libraryId":5,"type":84,"typeLabel":85,"stem":110,"options":111,"answer":27,"analysis":37},941618,"关于政府和社会资本合作（PPP）模式的特点，表述错误的是（ ）。",[112,114,116,118],{"key":20,"text":113,"correct":29},"主要适用于政府负有提供责任又适宜市场化运作的基础设施和公共服务类项目",{"key":24,"text":115,"correct":29},"主要方式有特许经营、购买服务、股权合作等",{"key":27,"text":117,"correct":22},"是一种长期合作关系，风险主要由社会资本承担",{"key":31,"text":119,"correct":29},"政府部门负责基础设施及公共服务价格和质量监管",{"id":121,"libraryId":5,"type":84,"typeLabel":85,"stem":122,"options":123,"answer":31,"analysis":37},941619,"政府和社会资本合作（PPP）项目常用的回报机制中，对于轨道交通等准经营性项目，应选用（ ）回报机制。",[124,125,126,127],{"key":20,"text":25,"correct":29},{"key":24,"text":21,"correct":29},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},941620,"政府和社会资本合作（PPP）模式分析中，物有所值定性评价的定性基本评价指标包括（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"全生命周期整合程度",{"key":24,"text":135,"correct":22},"风险识别与分配",{"key":27,"text":137,"correct":22},"绩效导向与鼓励创新",{"key":31,"text":139,"correct":22},"潜在竞争程度",{"key":34,"text":141,"correct":29},"项目规模大小","ABCD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":153,"analysis":37},941621,"政府和社会资本合作（PPP）项目实施方案编制的基本要求包括（ ）。",[147,149,150,151,152],{"key":20,"text":148,"correct":29},"约束性",{"key":24,"text":43,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":49,"correct":29},{"key":34,"text":47,"correct":22},"BCE",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},941622,"一般而言，政府和社会资本合作（PPP）模式中社会资本根据其主要业务类型和投资目的，可分为（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"以运营为目的的运营商",{"key":24,"text":161,"correct":22},"以投资为目的的投资型社会资本",{"key":27,"text":163,"correct":29},"以为项目全生命周期服务为目的的服务商",{"key":31,"text":165,"correct":29},"以承揽项目设计为主要目的的设计型社会资本",{"key":34,"text":167,"correct":22},"以承揽项目施工建设为主要目的的施工型社会资本","ABE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":52,"analysis":37},941623,"政府和社会资本合作（PPP）项目物有所值评价中，风险承担支出应充分考虑各类风险出现的概率和带来的支出责任，可采用（ ）进行测算。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"比例法",{"key":24,"text":176,"correct":22},"概率法",{"key":27,"text":178,"correct":22},"情景分析法",{"key":31,"text":180,"correct":29},"风险评价矩阵法",{"key":34,"text":182,"correct":29},"蒙特卡罗模拟法",{"id":184,"libraryId":5,"type":84,"typeLabel":85,"stem":185,"options":186,"answer":20,"analysis":37},941624,"政府和社会资本合作（PPP）项目实施过程中，监管体系一般不包括（ ）。",[187,189,191,193],{"key":20,"text":188,"correct":22},"监理监管",{"key":24,"text":190,"correct":29},"履约监管",{"key":27,"text":192,"correct":29},"行政监管",{"key":31,"text":194,"correct":29},"公众监管",{"id":196,"libraryId":5,"type":84,"typeLabel":85,"stem":197,"options":198,"answer":24,"analysis":37},941625,"政府和社会资本合作（PPP）项目中，在遴选社会资本投资人阶段的评分办法应采用（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":29},"性价比法",{"key":24,"text":202,"correct":22},"综合评分法",{"key":27,"text":204,"correct":29},"专家打分法",{"key":31,"text":206,"correct":29},"经评审的最低投标价法",{"id":208,"libraryId":5,"type":84,"typeLabel":85,"stem":209,"options":210,"answer":27,"analysis":37},941626,"（ ）的编制是在项目前期工作成果的基础上，进一步对政府和社会资本合作项目合作的交易结构、合作边界、投融资模式、监管等主要内容进行充分论证。",[211,213,215,217],{"key":20,"text":212,"correct":29},"项目可行性分析",{"key":24,"text":214,"correct":29},"项目建议书",{"key":27,"text":216,"correct":22},"项目实施方案",{"key":31,"text":218,"correct":29},"项目申请书",{"id":220,"libraryId":5,"type":84,"typeLabel":85,"stem":221,"options":222,"answer":20,"analysis":37},941627,"PPP 项目实施方案物有所值的定性评价，一般采用的方法是（ ）。",[223,224,225,226],{"key":20,"text":204,"correct":22},{"key":24,"text":178,"correct":29},{"key":27,"text":174,"correct":29},{"key":31,"text":176,"correct":29},{"id":228,"libraryId":5,"type":84,"typeLabel":85,"stem":229,"options":230,"answer":20,"analysis":37},941628,"每一年度全部政府和社会资本合作（PPP）项目需要从预算中安排的支出责任，占一般公共预算支出比例应当不超过（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":22},"10%",{"key":24,"text":234,"correct":29},"30%",{"key":27,"text":236,"correct":29},"5%",{"key":31,"text":238,"correct":29},"15%",{"id":240,"libraryId":5,"type":84,"typeLabel":85,"stem":241,"options":242,"answer":27,"analysis":37},941629,"PPP 项目实施方案风险识别与分配中，属于系统性风险的是（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":29},"施工风险",{"key":24,"text":246,"correct":29},"设计风险",{"key":27,"text":248,"correct":22},"经济风险",{"key":31,"text":250,"correct":29},"管理风险",{"id":252,"libraryId":5,"type":84,"typeLabel":85,"stem":253,"options":254,"answer":31,"analysis":37},941630,"PPP 项目实施方案风险识别与分配中，属于非系统性风险的是（ ）。",[255,257,259,260],{"key":20,"text":256,"correct":29},"不可抗力风险",{"key":24,"text":258,"correct":29},"政策风险",{"key":27,"text":248,"correct":29},{"key":31,"text":261,"correct":22},"投资控制风险",{"id":263,"libraryId":5,"type":84,"typeLabel":85,"stem":264,"options":265,"answer":20,"analysis":37},941631,"PPP 项目实施方案中风险分配的原则不包括（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"坚持风险分担.利益共享原则",{"key":24,"text":269,"correct":29},"由对风险最有控制力的一方承担相应风险的原则",{"key":27,"text":271,"correct":29},"承担的风险程度与所得回报相匹配的原则",{"key":31,"text":273,"correct":29},"承担风险的一方能够将风险合理转移的原则",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":288,"analysis":37},941632,"PPP 项目，实施方案中首先要明确项目类型，一般可分为（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"新建",{"key":24,"text":281,"correct":29},"在建",{"key":27,"text":283,"correct":29},"基础设施",{"key":31,"text":285,"correct":22},"存量",{"key":34,"text":287,"correct":29},"公共服务项目","AD",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":288,"analysis":37},941634,"政府和社会资本合作（PPP）项目财政承受能力论证工作中，财政承受能力评估包括（ ）。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"财政支出能力评估",{"key":24,"text":296,"correct":29},"政府机构能力评估",{"key":27,"text":298,"correct":29},"责任识别和支出测算",{"key":31,"text":300,"correct":22},"行业和领域平衡性评估",{"key":34,"text":302,"correct":29},"全生命周期整合程度评估",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":317,"analysis":37},941635,"项目方案变更管理视内容、投资大小可分为（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"一般性变更",{"key":24,"text":310,"correct":29},"较大变更",{"key":27,"text":312,"correct":22},"重大变更",{"key":31,"text":314,"correct":29},"特别重大变更",{"key":34,"text":316,"correct":29},"设计变更","AC",{"id":319,"libraryId":5,"type":84,"typeLabel":85,"stem":320,"options":321,"answer":20,"analysis":37},941636,"下列建设项目中，仅从项目类型上考虑，最适宜采用政府和社会资本合作（PPP）模式建设的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"某二线城市的综合管廊建设项目",{"key":24,"text":325,"correct":29},"某化工企业的改扩建工程",{"key":27,"text":327,"correct":29},"某房地产开发企业拟建设的度假村项目",{"key":31,"text":329,"correct":29},"某自来水厂的技术改造项目",{"id":331,"libraryId":5,"type":84,"typeLabel":85,"stem":332,"options":333,"answer":31,"analysis":37},941637,"下列指标中，属于政府和社会资本合作（PPP）项目物有所值定性评价基本指标的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":29},"项目规模",{"key":24,"text":337,"correct":29},"全生命周期成本",{"key":27,"text":339,"correct":29},"运营收入正常潜力",{"key":31,"text":133,"correct":22},{"id":342,"libraryId":5,"type":84,"typeLabel":85,"stem":343,"options":344,"answer":20,"analysis":37},941638,"政府和社会资本合作（PPP）项目物有所值评价中采取 PPP 值和 PSC 值进行比较，其中 PSC 值的确定一般应参照（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"项目的建设和运营维护净成本，竞争性中立调整值、项目全部风险成本",{"key":24,"text":348,"correct":29},"项目的建设成本，竞争性中立调整值，项目全部风险成本",{"key":27,"text":350,"correct":29},"项目的建设和运营维护净成本，竞争性中立调整值，社会资本的风险成本",{"key":31,"text":352,"correct":29},"项目的建设成本、竞争性中立调整值，政府自留的风险成本",{"id":354,"libraryId":5,"type":84,"typeLabel":85,"stem":355,"options":356,"answer":20,"analysis":37},941639,"下列选项中，属于回报机制政府付费项目的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"市政绿化项目",{"key":24,"text":360,"correct":29},"轨道交通",{"key":27,"text":362,"correct":29},"效益较好的收费公路",{"key":31,"text":364,"correct":29},"城市综合管廊",{"id":366,"libraryId":5,"type":84,"typeLabel":85,"stem":367,"options":368,"answer":31,"analysis":37},941640,"政府和社会资本合作（PPP）项目物有所值评价中，对可行性缺口补助模式的项目，在项目运营补贴期间，政府每年直接付费数额须扣除（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":29},"合理利润",{"key":24,"text":372,"correct":29},"年均建设成本",{"key":27,"text":374,"correct":29},"年度运营成本",{"key":31,"text":376,"correct":22},"每年使用者付费数额",{"id":378,"libraryId":5,"type":84,"typeLabel":85,"stem":379,"options":380,"answer":27,"analysis":37},941641,"PPP 模式既可用于新建项目，也可用于存量项目，两类项目区分的界限是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":29},"是否已建设",{"key":24,"text":384,"correct":29},"是否已完工",{"key":27,"text":386,"correct":22},"是否通过竣工验收",{"key":31,"text":388,"correct":29},"是否需要更新改造",{"id":390,"libraryId":5,"type":84,"typeLabel":85,"stem":391,"options":392,"answer":27,"analysis":37},941642,"PPP 模式中，不可抗力风险应该由（ ）承担。",[393,395,397,399],{"key":20,"text":394,"correct":29},"政府方承担",{"key":24,"text":396,"correct":29},"社会资本方承担",{"key":27,"text":398,"correct":22},"双方共同承担",{"key":31,"text":400,"correct":29},"转移给第三方",{"id":402,"libraryId":5,"type":84,"typeLabel":85,"stem":403,"options":404,"answer":27,"analysis":37},941643,"政府和社会资本合作（PPP）项目物有所值评价中，政府方净成本的现值（PPP 值）与公共部门比较值（PSC 值）进行比较可对等扣除的是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":29},"有关税费",{"key":24,"text":408,"correct":29},"行政审批费用",{"key":27,"text":410,"correct":22},"政府自留风险的承担成本",{"key":31,"text":412,"correct":29},"可转移给社会资本的风险承担成本",{"id":414,"libraryId":5,"type":84,"typeLabel":85,"stem":415,"options":416,"answer":24,"analysis":37},941644,"地下工程项目出现前期地质勘察设计与实际施工情况不适应时，将发生项目中断、工期延误、费用增加等风险，属于非系统风险中的（ ）。",[417,418,419,420],{"key":20,"text":244,"correct":29},{"key":24,"text":246,"correct":22},{"key":27,"text":250,"correct":29},{"key":31,"text":421,"correct":29},"移交风险",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":433,"analysis":37},941645,"政府和社会资本合作（PPP）项目实施方案中需进行风险识别与分配。风险分配原则包括（ ）。",[426,427,429,430,431],{"key":20,"text":271,"correct":22},{"key":24,"text":428,"correct":29},"承担风险的一方具有承担风险意愿的原则",{"key":27,"text":273,"correct":22},{"key":31,"text":269,"correct":22},{"key":34,"text":432,"correct":29},"社会资本方不愿意承担的风险由政府方承担的原则","ACD",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":447,"analysis":37},941646,"以下关于政府和社会资本合作（PPP）模式适用范围的说法，正确的有（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":29},"仅限于以在新建项目中使用",{"key":24,"text":441,"correct":29},"主要适用于不适宜市场化运作的基础设施类项目",{"key":27,"text":443,"correct":22},"可以用于新建项目，也可以在存量、在建项目中使用",{"key":31,"text":445,"correct":29},"主要适用于政府负有提供责任的大型公共服务类项目",{"key":34,"text":113,"correct":22},"CE",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":462,"analysis":37},941647,"政府和社会资本合作（PPP）项目实施方案中需进行风险识别与分配。以下风险因素中，一般情况下社会资本方需承担的风险有（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":29},"社会风险",{"key":24,"text":455,"correct":22},"融资风险",{"key":27,"text":457,"correct":29},"法律风险",{"key":31,"text":459,"correct":29},"不可抗力",{"key":34,"text":461,"correct":22},"维护风险","BE",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":477,"analysis":37},941648,"编制PPP 模式实施方案应满足（ ）要求。",[467,469,471,473,475],{"key":20,"text":468,"correct":22},"尊重契约精神，建立长期合作关系",{"key":24,"text":470,"correct":22},"宏观与微观相结合，统筹近期与远期关系",{"key":27,"text":472,"correct":22},"坚持风险分担，利益共享",{"key":31,"text":474,"correct":29},"确保公共利益最大化",{"key":34,"text":476,"correct":22},"保障社会资本获得合理回报","ABCE",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":153,"analysis":37},941649,"以下属于政府和社会资本合作（PPP）项目实施方案编制内容的有（ ）。",[482,484,486,488,490],{"key":20,"text":483,"correct":29},"技术方案",{"key":24,"text":485,"correct":22},"项目交易结构",{"key":27,"text":487,"correct":22},"物有所值论证",{"key":31,"text":489,"correct":29},"总体建设方案",{"key":34,"text":135,"correct":22},{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":168,"analysis":37},941650,"政府和社会资本合作（PPP）项目实施方案中需进行风险识别与分配。以下风险因素中，属于系统性风险的有（ ）。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"暴乱",{"key":24,"text":498,"correct":22},"通货膨胀",{"key":27,"text":500,"correct":29},"安全措施不力",{"key":31,"text":502,"correct":29},"运营费用超支",{"key":34,"text":504,"correct":22},"行业标准调整",{"id":506,"libraryId":5,"type":84,"typeLabel":85,"stem":507,"options":508,"answer":27,"analysis":37},941651,"区分新建和存量项目，以项目是否通过（ ）为依据。",[509,511,513,515],{"key":20,"text":510,"correct":29},"项目决策",{"key":24,"text":512,"correct":29},"项目后评价",{"key":27,"text":514,"correct":22},"竣工验收",{"key":31,"text":516,"correct":29},"交工验收",{"id":518,"libraryId":5,"type":84,"typeLabel":85,"stem":519,"options":520,"answer":20,"analysis":37},941652,"政府和社会资本合作（PPP）项目原则上政府方股份应低于（ ），也可以完全不参股项目公司。",[521,523,525,527],{"key":20,"text":522,"correct":22},"50％",{"key":24,"text":524,"correct":29},"51％",{"key":27,"text":526,"correct":29},"30％",{"key":31,"text":528,"correct":29},"20％",{"id":530,"libraryId":5,"type":84,"typeLabel":85,"stem":531,"options":532,"answer":20,"analysis":37},941653,"政府和社会资本合作（PPP）项目在整个合作期内的合同体系中，（ ）是指在社会资本招商阶段，要求投标人随投标文件一同递交给招标人的一定形式、一定金额的投标责任担保。",[533,535,537,539],{"key":20,"text":534,"correct":22},"投标保证金",{"key":24,"text":536,"correct":29},"履约保证",{"key":27,"text":538,"correct":29},"合作期内履约保证",{"key":31,"text":540,"correct":29},"项目前期履约保证",{"id":542,"libraryId":5,"type":84,"typeLabel":85,"stem":543,"options":544,"answer":27,"analysis":37},941654,"下列项目属于使用者付费+可行性缺口补助的是（ ）。",[545,547,549,550],{"key":20,"text":546,"correct":29},"收费公路",{"key":24,"text":548,"correct":29},"水处理项目",{"key":27,"text":364,"correct":22},{"key":31,"text":358,"correct":29},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":565,"analysis":37},941655,"关于政府和社会资本合作（PPP）项目物有所值评价的说法，正确的有（ ）。",[555,557,559,561,563],{"key":20,"text":556,"correct":29},"物有所值评价必须进行定量评价",{"key":24,"text":558,"correct":22},"政府机构能力是物有所值评价内容之一",{"key":27,"text":560,"correct":22},"物有所值评价是判断项目是否采用PPP模式实施的决策基础",{"key":31,"text":562,"correct":22},"定量评价的前提是假定PPP模式和政府传统投资模式的产出绩效相同",{"key":34,"text":564,"correct":29},"物有所值验证只有一次机会，一旦不能通过，就不再采用PPP模式","BCD",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":142,"analysis":37},941656,"影响PPP 项目运作方式选择的因素有（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"收费定价机制",{"key":24,"text":573,"correct":22},"项目投资收益水平",{"key":27,"text":575,"correct":22},"融资需求",{"key":31,"text":577,"correct":22},"改扩建需求",{"key":34,"text":579,"correct":29},"操作模式",{"id":581,"libraryId":5,"type":84,"typeLabel":85,"stem":582,"options":583,"answer":24,"analysis":37},941657,"根据《政府和社会资本合作项目财政承受能力论证指引》，在财政承受能力评估时，政府年度财政预算支出中用于政府和社会资本合作（PPP）项目的支出与一般公共预算支出的比例上限是（ ）。",[584,585,586,587],{"key":20,"text":236,"correct":29},{"key":24,"text":232,"correct":22},{"key":27,"text":238,"correct":29},{"key":31,"text":588,"correct":29},"20%",{"id":590,"libraryId":5,"type":84,"typeLabel":85,"stem":591,"options":592,"answer":24,"analysis":37},941658,"某项目工程费用 8000 万元（含可抵扣固定资产进项税 500 万元），计入固定资产原值的工程建设其他费用 800 万元，无形资产 200 万元，其他资产 150 万元，预备费 1000 万元，流动资金 2000 万元，建设期利息 300 万元，预计净残值率为 3%，通常在财务分析中，其净残值应为（ ）万元。",[593,595,597,599],{"key":20,"text":594,"correct":29},"279",{"key":24,"text":596,"correct":22},"288",{"key":27,"text":598,"correct":29},"294",{"key":31,"text":600,"correct":29},"303",{"id":602,"libraryId":5,"type":84,"typeLabel":85,"stem":603,"options":604,"answer":24,"analysis":37},941659,"某项目建设期1 年，全部资金投入1000 万元，项目投资净现金流量如下所示，若折现率为10%，则下列说法中，正确的是（ ）",[605,607,609,611],{"key":20,"text":606,"correct":29},"财务净现值为13万元",{"key":24,"text":608,"correct":22},"财务内部收益率为9.43%左右",{"key":27,"text":610,"correct":29},"静态投资回收期为2.85年",{"key":31,"text":612,"correct":29},"动态投资回收期为5.4年",{"id":614,"libraryId":5,"type":84,"typeLabel":85,"stem":615,"options":616,"answer":24,"analysis":37},941660,"投资项目净现值为零时所对应指标的收益率称为（ ）。",[617,619,621,623],{"key":20,"text":618,"correct":29},"利息备付率",{"key":24,"text":620,"correct":22},"内部收益率",{"key":27,"text":622,"correct":29},"净现率",{"key":31,"text":624,"correct":29},"偿债备付率",{"id":626,"libraryId":5,"type":84,"typeLabel":85,"stem":627,"options":628,"answer":20,"analysis":37},941661,"关于互斥型方案的经济比选中各指标的说法，正确的是（ ）。",[629,631,633,635],{"key":20,"text":630,"correct":22},"若增量投资收益率大于基准投资收益率，则投资额大的方案为优选方案；反之，投资小的方案为优选方案",{"key":24,"text":632,"correct":29},"净年值比较法在互斥方案必须时，考虑到不同投资.不同收益对项目产生的影响",{"key":27,"text":634,"correct":29},"净现值率是一种相对评价方法，在净现值的基础上提出来，可作为净年值法的一种补充",{"key":31,"text":636,"correct":29},"净现值法和净现值率法在方案比选的结论是一致的",{"id":638,"libraryId":5,"type":84,"typeLabel":85,"stem":639,"options":640,"answer":31,"analysis":37},941662,"下列关于建设方案研究的表述中错误的是（ ）。",[641,643,645,647],{"key":20,"text":642,"correct":29},"建设方案研究是构造相对最佳建设方案的过程",{"key":24,"text":644,"correct":29},"建设方案研究与比选是项目决策分析与评价的核心内容",{"key":27,"text":646,"correct":29},"项目决策分析与评价不同阶段的建设方案研究工作深度不同",{"key":31,"text":648,"correct":22},"建设方案研究的任务是对两个以下可能的建设方案进行优化选择",[650,653,656,659,662,665],{"id":84,"name":651,"category":7,"favorite":652},"领导干部任职前廉政法规知识测试题",92,{"id":654,"name":655,"category":7,"favorite":84},595,"建筑结构与设备",{"id":657,"name":658,"category":7,"favorite":84},715,"招标采购专业知识与法律法规",{"id":660,"name":661,"category":7,"favorite":84},848,"市政方向-通用基础",{"id":663,"name":664,"category":7,"favorite":8},534,"BIM工程师",{"id":666,"name":664,"category":7,"favorite":8},535]