[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":678},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,15,50,1135,[13,34,46,58,70,88,103,118,133,148,160,172,184,196,208,220,232,244,255,267,279,291,303,314,326,340,355,369,383,398,412,427,442,457,472,487,501,515,529,543,558,571,585,599,611,622,634,646,658,670],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},941510,1,"单选题","产品方案是指拟建项目的主要产品、辅助产品或附产品及其生产能力的组合方案。产品方案研究的内容通常不包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","主要产品品种",false,{"key":24,"text":25,"correct":22},"B","产品年产量",{"key":27,"text":28,"correct":22},"C","产品用途",{"key":30,"text":31,"correct":32},"D","生产设备",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},941511,"下列关于可行性研究中投资估算作用的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"投资估算是制定项目融资方案的依据",{"key":24,"text":41,"correct":22},"投资估算是进行项目经济评价的基础",{"key":27,"text":43,"correct":32},"投资估算是编制施工图预算的依据",{"key":30,"text":45,"correct":22},"投资估算是投资决策的依据之一",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},941512,"下列关于可行性研究作用的说法，错误的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"投资决策的依据",{"key":24,"text":53,"correct":32},"进行项目施工图设计的依据",{"key":27,"text":55,"correct":22},"筹措资金和申请贷款的依据",{"key":30,"text":57,"correct":22},"编制初步设计文件的依据",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},941513,"下列关于可行性研究及其报告应达到的深度要求的说法中，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"应达到内容齐全、数据准确、论据充分、结论明确的要求",{"key":24,"text":65,"correct":22},"要以市场为导向",{"key":27,"text":67,"correct":32},"选用的主要设备的规格、参数应能满足合同谈判的要求",{"key":30,"text":69,"correct":22},"应能满足项目初步设计的要求",{"id":71,"libraryId":5,"type":72,"typeLabel":73,"stem":74,"options":75,"answer":87,"analysis":33},941514,2,"多选题","对涉及国家经济安全的投资项目，除了进行常规的财务分析、经济费用效益分析外，还应从资本控制安全、产业成长安全、（ ）等角度进行经济影响分析。",[76,78,80,82,84],{"key":20,"text":77,"correct":32},"产业技术安全",{"key":24,"text":79,"correct":32},"资源供应安全",{"key":27,"text":81,"correct":22},"投资环境安全",{"key":30,"text":83,"correct":22},"职工就业安全",{"key":85,"text":86,"correct":32},"E","市场环境安全","ABE",{"id":89,"libraryId":5,"type":72,"typeLabel":73,"stem":90,"options":91,"answer":102,"analysis":33},941515,"下列属于总图运输方案研究的内容的有（ ）。",[92,94,96,98,100],{"key":20,"text":93,"correct":32},"总体布置",{"key":24,"text":95,"correct":32},"厂区总平面布置",{"key":27,"text":97,"correct":32},"竖向布置",{"key":30,"text":99,"correct":32},"厂内、厂外运输",{"key":85,"text":101,"correct":22},"原材料燃料供应","ABCD",{"id":104,"libraryId":5,"type":72,"typeLabel":73,"stem":105,"options":106,"answer":117,"analysis":33},941516,"下列关于资本运作类项目的特点，表述正确的有（ ）。",[107,109,111,113,115],{"key":20,"text":108,"correct":22},"兼并类项目被兼并企业的法人地位并不消失",{"key":24,"text":110,"correct":32},"BOT类项目可以最大限度地减少投资风险，保证投资者的利益",{"key":27,"text":112,"correct":32},"企业通过发行股票筹集资金是企业融资的一种方式",{"key":30,"text":114,"correct":22},"并购项目的投资回报主要来源于企业股权的转让",{"key":85,"text":116,"correct":22},"风险投资项目主要投资处于成长阶段的创新企业","BC",{"id":119,"libraryId":5,"type":72,"typeLabel":73,"stem":120,"options":121,"answer":132,"analysis":33},941517,"B0T 项目可行性研究的重点有（ ）。",[122,124,126,128,130],{"key":20,"text":123,"correct":32},"竞争因素",{"key":24,"text":125,"correct":32},"消费者需求",{"key":27,"text":127,"correct":22},"项目的潜在价值",{"key":30,"text":129,"correct":32},"盈利稳定性的估计",{"key":85,"text":131,"correct":32},"项目回报率","ABDE",{"id":134,"libraryId":5,"type":72,"typeLabel":73,"stem":135,"options":136,"answer":147,"analysis":33},941518,"可行性研究的重点内容包括（ ）。",[137,139,141,143,145],{"key":20,"text":138,"correct":32},"项目建设的必要性",{"key":24,"text":140,"correct":22},"项目建设的可能性",{"key":27,"text":142,"correct":32},"市场与竞争力分析",{"key":30,"text":144,"correct":32},"投资估算与融资方案",{"key":85,"text":146,"correct":32},"社会评价或社会影响分析","ACDE",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},941519,"在使用成本和费用估算的方法的时候，期间费用不包括（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"其他管理费用",{"key":24,"text":155,"correct":22},"财务费用",{"key":27,"text":157,"correct":32},"折旧费用",{"key":30,"text":159,"correct":22},"其他营业费用",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},941520,"对属于《核准目录》内、须经政府投资主管部门核准的投资项目，可行性研究结论可以作为编制（ ）的依据。",[164,166,168,170],{"key":20,"text":165,"correct":32},"项目申请书",{"key":24,"text":167,"correct":22},"项目建议书",{"key":27,"text":169,"correct":22},"项目规划",{"key":30,"text":171,"correct":22},"项目策划",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},941521,"可行性研究要以市场为导向，围绕增强核心竞争力做工作，以（ ）为中心，最大限度地优化方案，提高投资效益或效果。",[176,178,180,182],{"key":20,"text":177,"correct":32},"经济效益",{"key":24,"text":179,"correct":22},"建设方案",{"key":27,"text":181,"correct":22},"市场分析",{"key":30,"text":183,"correct":22},"风险分析",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},941522,"关于建设项目可行性研究报告深度要求的说法，正确的是（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":32},"重大技术方案要进行多方案比选",{"key":24,"text":191,"correct":22},"可行性研究阶段不需要进行融资方案研究",{"key":27,"text":193,"correct":22},"投资和成本费用的估算不需采用分项详细估算法",{"key":30,"text":195,"correct":22},"设备方案不需要提供主要设备的规格.型号和材质数据",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":30,"analysis":33},941523,"对于财务现金流量不能全面、真实地反映其经济价值的项目，应进行（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"偿债能力分析",{"key":24,"text":203,"correct":22},"财务生存能力分析",{"key":27,"text":205,"correct":22},"财务盈利能力",{"key":30,"text":207,"correct":32},"经济分析",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},941524,"若引进国外技术和进口设备，则需要在分析（ ）的前提下，进行技术经济分析比较，提出引进方式、引进和进口的范围、内容及理由。",[212,214,216,218],{"key":20,"text":213,"correct":22},"市场容量",{"key":24,"text":215,"correct":32},"国内技术",{"key":27,"text":217,"correct":22},"建设规模",{"key":30,"text":219,"correct":22},"投资成本",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":30,"analysis":33},941525,"生产工艺技术和装备方案研究中，装置组成不包括（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"工序",{"key":24,"text":227,"correct":22},"辅助生产单元",{"key":27,"text":229,"correct":22},"生活设施",{"key":30,"text":231,"correct":32},"辅助材料",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":27,"analysis":33},941526,"地质灾害危险性评估必须在（ ）之前进行。",[236,238,240,242],{"key":20,"text":237,"correct":22},"初步可行性研究阶段",{"key":24,"text":239,"correct":22},"厂址选择阶段",{"key":27,"text":241,"correct":32},"申请建设用地",{"key":30,"text":243,"correct":22},"可行性研究阶段",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},941527,"下列有关投资估算说法不正确的是（ ）。",[248,250,252,253],{"key":20,"text":249,"correct":22},"投资估算是投资决策的依据",{"key":24,"text":251,"correct":32},"投资估算是编制预算的依据",{"key":27,"text":41,"correct":22},{"key":30,"text":254,"correct":22},"投资估算是确定融资方案的依据",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":27,"analysis":33},941528,"改、扩建和技术改造项目投资估算中，项目范围内原有固定资产指的是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"“有项目”投资",{"key":24,"text":262,"correct":22},"“新增”投资",{"key":27,"text":264,"correct":32},"“现状”数据",{"key":30,"text":266,"correct":22},"“无项目”投资",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},941529,"根据《中华人民共和国中外合资经营企业法》和《国家工商行政管理局中外合资经营企业注册资本与投资的比例的暂行规定》要求，中外合资经营项目注册资金的最低比例，根据（ ）不同确定。",[271,273,275,277],{"key":20,"text":272,"correct":22},"行业性质",{"key":24,"text":274,"correct":32},"投资规模",{"key":27,"text":276,"correct":22},"国家",{"key":30,"text":278,"correct":22},"区域",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},941530,"上报国家和地方政府有关部门审批的项目，（ ）的铺底流动资金必须是权益资本。",[283,285,287,289],{"key":20,"text":284,"correct":22},"10%",{"key":24,"text":286,"correct":22},"20%",{"key":27,"text":288,"correct":32},"30%",{"key":30,"text":290,"correct":22},"40%",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":30,"analysis":33},941531,"项目可行性研究经济分析中，水利枢纽项目的直接效益不能体现在（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"防洪效益",{"key":24,"text":298,"correct":22},"减於效益",{"key":27,"text":300,"correct":22},"发电效益",{"key":30,"text":302,"correct":32},"时间效益",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":30,"analysis":33},941532,"当项目效果不能或难于货币量化时，或货币量化的效果不是项目目标的主体时，在经济分析中可采用（ ）方法，并将其结论作为项目投资决策的依据。",[307,309,311,312],{"key":20,"text":308,"correct":22},"有无对比分析",{"key":24,"text":310,"correct":22},"敏感性分析",{"key":27,"text":201,"correct":22},{"key":30,"text":313,"correct":32},"费用效果分析",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},941533,"（ ）是国际上最主要的直接投资方式。",[318,320,322,324],{"key":20,"text":319,"correct":32},"企业兼并",{"key":24,"text":321,"correct":22},"股票上市",{"key":27,"text":323,"correct":22},"融资",{"key":30,"text":325,"correct":22},"BOT类项目",{"id":327,"libraryId":5,"type":72,"typeLabel":73,"stem":328,"options":329,"answer":102,"analysis":33},941534,"下列关于可行性研究报告中的财务分析作用的表述，正确的有（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":32},"项目可行性研究的重要内容",{"key":24,"text":333,"correct":32},"决策的重要依据",{"key":27,"text":335,"correct":32},"项目或方案比选中起着重要作用",{"key":30,"text":337,"correct":32},"配合投资各方谈判，促进平等合作",{"key":85,"text":339,"correct":22},"为政府合理配置资源提供依据",{"id":341,"libraryId":5,"type":72,"typeLabel":73,"stem":342,"options":343,"answer":354,"analysis":33},941535,"财务分析时，销售产品或服务涉及的税费主要有（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":32},"增值税",{"key":24,"text":347,"correct":32},"消费税",{"key":27,"text":349,"correct":22},"营业税",{"key":30,"text":351,"correct":22},"所得税",{"key":85,"text":353,"correct":22},"车船税","AB",{"id":356,"libraryId":5,"type":72,"typeLabel":73,"stem":357,"options":358,"answer":87,"analysis":33},941536,"下列关于风险分析的说法，正确的是（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":32},"风险分析贯穿于项目分析的各个环节和全过程",{"key":24,"text":362,"correct":32},"风险分析首先应由各专业人员在可行性研究报告各章节内容中论述，并在本章予以归纳",{"key":27,"text":364,"correct":22},"投资项目具有一次性和变化性的特点",{"key":30,"text":366,"correct":22},"所有投资项目的风险都是一致的",{"key":85,"text":368,"correct":32},"采用定性或定量分析方法估计风险程度",{"id":370,"libraryId":5,"type":72,"typeLabel":73,"stem":371,"options":372,"answer":102,"analysis":33},941537,"项目可行性研究中，市场与竞争力分析的内容有（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":32},"供需状况和销售价格",{"key":24,"text":376,"correct":32},"产品的目标市场",{"key":27,"text":378,"correct":32},"占有的市场份额",{"key":30,"text":380,"correct":32},"产品的营销策略",{"key":85,"text":382,"correct":22},"是否符合区域规划",{"id":384,"libraryId":5,"type":72,"typeLabel":73,"stem":385,"options":386,"answer":397,"analysis":33},941538,"可行性研究报告的研究结论中，境内投资项目需要说明的有（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":32},"项目是否符合国家产业政策要求",{"key":24,"text":390,"correct":32},"项目是否符合行业准入条件",{"key":27,"text":392,"correct":22},"可行性研究报告推荐方案的主要理由",{"key":30,"text":394,"correct":32},"项目是否与所在地的发展规划相适应",{"key":85,"text":396,"correct":22},"项目遇到的特殊情况及处理措施","ABD",{"id":399,"libraryId":5,"type":72,"typeLabel":73,"stem":400,"options":401,"answer":354,"analysis":33},941539,"项目可行性研究报告中，目标市场分析包含的内容有（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":32},"目标市场选择与结构分析",{"key":24,"text":405,"correct":32},"主要用户分析",{"key":27,"text":407,"correct":22},"产品结构分析",{"key":30,"text":409,"correct":22},"盈利空间分析",{"key":85,"text":411,"correct":22},"产品竞争力综合分析",{"id":413,"libraryId":5,"type":72,"typeLabel":73,"stem":414,"options":415,"answer":426,"analysis":33},941540,"可行性研究报告市场预测分析中，市场风险分析包括（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"编制风险报告",{"key":24,"text":419,"correct":32},"识别风险因素",{"key":27,"text":421,"correct":32},"估计风险程度",{"key":30,"text":423,"correct":32},"提出风险对策",{"key":85,"text":425,"correct":22},"收集风险信息","BCD",{"id":428,"libraryId":5,"type":72,"typeLabel":73,"stem":429,"options":430,"answer":441,"analysis":33},941541,"对于规模较小，且市场较为确定的项目，其市场预测分析重点是分析（ ），研究其竞争优势和竞争力。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"国外市场",{"key":24,"text":434,"correct":22},"国内市场",{"key":27,"text":436,"correct":22},"行业市场",{"key":30,"text":438,"correct":32},"区域市场",{"key":85,"text":440,"correct":32},"目标市场","DE",{"id":443,"libraryId":5,"type":72,"typeLabel":73,"stem":444,"options":445,"answer":456,"analysis":33},941542,"项目的可行性研究中，国外市场预测分析的内容有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":32},"市场供应现状及预测",{"key":24,"text":449,"correct":32},"市场需求现状及预测",{"key":27,"text":451,"correct":32},"市场供需平衡分析",{"key":30,"text":453,"correct":22},"产品需求周期性分析",{"key":85,"text":455,"correct":22},"产品供给周期性分析","ABC",{"id":458,"libraryId":5,"type":72,"typeLabel":73,"stem":459,"options":460,"answer":471,"analysis":33},941543,"下列属于邀请招标的情形有（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":32},"技术复杂.有特殊要求或者受自然环境限制，只有少量潜在投标人可供选择",{"key":24,"text":464,"correct":22},"需要采用不可替代的专利或者专有技术",{"key":27,"text":466,"correct":32},"采用公开招标方式的费用占项目合同金额的比例过大",{"key":30,"text":468,"correct":22},"采购人依法能够自行建设.生产或者提供",{"key":85,"text":470,"correct":22},"需要向原中标人采购工程.货物或者服务","AC",{"id":473,"libraryId":5,"type":72,"typeLabel":73,"stem":474,"options":475,"answer":486,"analysis":33},941544,"总图运输中竖向布置的内容包括（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":32},"工厂防洪标准及措施",{"key":24,"text":479,"correct":22},"厂区用地面积",{"key":27,"text":481,"correct":22},"容积率",{"key":30,"text":483,"correct":32},"场地排水方式",{"key":85,"text":485,"correct":32},"土石方工程量","ADE",{"id":488,"libraryId":5,"type":72,"typeLabel":73,"stem":489,"options":490,"answer":426,"analysis":33},941545,"投资估算编制说明包括的内容有（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"价格和取费参考的有关资料信息",{"key":24,"text":494,"correct":32},"说明项目的性质",{"key":27,"text":496,"correct":32},"拟采用的主要技术路线",{"key":30,"text":498,"correct":32},"简述项目生产规模",{"key":85,"text":500,"correct":22},"行业或部门有关投资估算编制办法或概算编制规定",{"id":502,"libraryId":5,"type":72,"typeLabel":73,"stem":503,"options":504,"answer":354,"analysis":33},941546,"资金筹措包括（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":32},"权益资金",{"key":24,"text":508,"correct":32},"债务资金",{"key":27,"text":510,"correct":22},"公司融资",{"key":30,"text":512,"correct":22},"项目融资",{"key":85,"text":514,"correct":22},"法人融资",{"id":516,"libraryId":5,"type":72,"typeLabel":73,"stem":517,"options":518,"answer":102,"analysis":33},941547,"项目的财务盈利性可能难以全面正确地反映项目的经济合理性，其表现在（ ）。",[519,521,523,525,527],{"key":20,"text":520,"correct":32},"国家给予项目补贴",{"key":24,"text":522,"correct":32},"企业向国家缴税",{"key":27,"text":524,"correct":32},"某些货物市场价格可能的扭曲",{"key":30,"text":526,"correct":32},"项目的外部效果",{"key":85,"text":528,"correct":22},"生产成本费用",{"id":530,"libraryId":5,"type":72,"typeLabel":73,"stem":531,"options":532,"answer":397,"analysis":33},941548,"下列关于不同行业项目可行性研究报告侧重点的说法正确的有（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":32},"水利水电项目经济评价以经济分析为主",{"key":24,"text":536,"correct":32},"交通运输项目经济评价以财务分析为辅",{"key":27,"text":538,"correct":22},"农业开发项目经营层次评价可进行经济分析",{"key":30,"text":540,"correct":32},"公共建设项目主要强调社会服务功能",{"key":85,"text":542,"correct":22},"经适房项目研究的重点在于取得较好的地块和容积率",{"id":544,"libraryId":5,"type":72,"typeLabel":73,"stem":545,"options":546,"answer":557,"analysis":33},941549,"兼并收购类项目并购的效益中企业自身的效益包括（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":32},"资本经营效益",{"key":24,"text":550,"correct":22},"财务协同效应",{"key":27,"text":552,"correct":32},"市场增加值",{"key":30,"text":554,"correct":32},"经济增加值",{"key":85,"text":556,"correct":22},"经营协同效应","ACD",{"id":559,"libraryId":5,"type":72,"typeLabel":73,"stem":560,"options":561,"answer":471,"analysis":33},941550,"并购的效益包括（ ）。",[562,564,566,568,569],{"key":20,"text":563,"correct":32},"企业自身的效益",{"key":24,"text":565,"correct":22},"资金结构分析",{"key":27,"text":567,"correct":32},"企业整体协同效益",{"key":30,"text":552,"correct":22},{"key":85,"text":570,"correct":22},"用款计划分析",{"id":572,"libraryId":5,"type":72,"typeLabel":73,"stem":573,"options":574,"answer":456,"analysis":33},941551,"BOT 项目的结构包括的组织有（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":32},"项目的发起人",{"key":24,"text":578,"correct":32},"项目的投资者",{"key":27,"text":580,"correct":32},"项目的贷款银行",{"key":30,"text":582,"correct":22},"项目的设计者",{"key":85,"text":584,"correct":22},"项目的监理单位",{"id":586,"libraryId":5,"type":72,"typeLabel":73,"stem":587,"options":588,"answer":354,"analysis":33},941552,"可行性研究报告的附文包括（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":32},"资金筹措意向性文件",{"key":24,"text":592,"correct":32},"编制可行性研究报告依据的有关文件",{"key":27,"text":594,"correct":22},"主要设备一览表",{"key":30,"text":596,"correct":22},"财务分析报表",{"key":85,"text":598,"correct":22},"工艺流程图",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":24,"analysis":33},941553,"关于工程方案中防震抗震编制内容及要求的说法，正确的是（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"抗震设防是指建筑物的设防",{"key":24,"text":606,"correct":32},"需提出设计基本地震加速度",{"key":27,"text":608,"correct":22},"抗震措施应结合工程结构特征，不考虑地质特征",{"key":30,"text":610,"correct":22},"工业项目厂址不应选择在需要地震设防的地区",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":30,"analysis":33},941554,"为便于计算费用与效益，一般副产品回收计入（ ）中。",[615,617,619,620],{"key":20,"text":616,"correct":22},"期间费用",{"key":24,"text":618,"correct":22},"固定资产折旧",{"key":27,"text":159,"correct":22},{"key":30,"text":621,"correct":32},"销售收入",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":24,"analysis":33},941555,"对有营业收入的项目，财务分析应根据收入抵补支出的不同程度，区别对待。通常营业收入补偿费用的顺序是（ ）。",[626,628,630,632],{"key":20,"text":627,"correct":22},"缴纳流转税—支付运营维护成本—偿还借款利息—计提折旧和偿还借款本金",{"key":24,"text":629,"correct":32},"支付运营维护成本—缴纳流转税—偿还借款利息—计提折旧和偿还借款本金",{"key":27,"text":631,"correct":22},"偿还借款利息—支付运营维护成本—缴纳流转税—计提折旧和偿还借款本金",{"key":30,"text":633,"correct":22},"支付运营维护成本—偿还借款利息—缴纳流转税—计提折旧和偿还借款本金",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":20,"analysis":33},941556,"非经营性项目财务分析中，营业收入补偿费用的顺序中，在缴纳流转税之前的是（ ）。",[638,640,642,644],{"key":20,"text":639,"correct":32},"支付运营维护成本",{"key":24,"text":641,"correct":22},"偿还借款利息",{"key":27,"text":643,"correct":22},"计提折旧",{"key":30,"text":645,"correct":22},"偿还借款本金",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":24,"analysis":33},941557,"下列投资项目的风险属于市场风险的是（ ）。",[650,652,654,656],{"key":20,"text":651,"correct":22},"对项目的社会影响估计不足",{"key":24,"text":653,"correct":32},"消费者的消费习惯.消费偏好发生变化",{"key":27,"text":655,"correct":22},"对技术的适用性和可靠性认识不足",{"key":30,"text":657,"correct":22},"主要管理者能力不足",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":27,"analysis":33},941558,"下列投资项目的风险属于组织管理风险的是（ ）。",[662,664,666,668],{"key":20,"text":663,"correct":22},"工艺技术与原料的匹配问题",{"key":24,"text":665,"correct":22},"产业政策的调整",{"key":27,"text":667,"correct":32},"主要管理者的道德水平",{"key":30,"text":669,"correct":22},"社会治安和公众态度",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":27,"analysis":33},941559,"市场预测分析中，对于规模较小，且市场较为确定的项目，重点分析（ ）。",[674,675,676,677],{"key":20,"text":432,"correct":22},{"key":24,"text":434,"correct":22},{"key":27,"text":438,"correct":32},{"key":30,"text":436,"correct":22},[679,682,685,688,691,694],{"id":15,"name":680,"category":7,"favorite":681},"领导干部任职前廉政法规知识测试题",92,{"id":683,"name":684,"category":7,"favorite":15},595,"建筑结构与设备",{"id":686,"name":687,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":689,"name":690,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":692,"name":693,"category":7,"favorite":8},534,"BIM工程师",{"id":695,"name":693,"category":7,"favorite":8},535]