[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-608-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":668},{"id":5,"name":6,"category":7,"favorite":8},608,"项目决策分析与评价","建筑工程",0,1,50,1135,[13,33,45,57,69,87,102,117,132,144,156,168,180,192,204,219,234,249,261,273,285,300,312,324,336,348,363,378,390,402,414,426,438,450,462,474,486,498,510,522,534,546,558,570,582,596,611,625,639,653],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},940634,"单选题","(2017年真题)九力模型综合评价的方法可以采用()。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","德尔菲法",false,{"key":23,"text":24,"correct":25},"B","专家评分法",true,{"key":27,"text":28,"correct":21},"C","综合评价法",{"key":30,"text":31,"correct":21},"D","加权平均法","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},940635,"(2017年真题)企业发展目标和任务是要量化规划期内的企业发展水平，一般分为总体目标和分解目标。下列属于企业分解目标的是()。",[37,39,41,43],{"key":19,"text":38,"correct":21},"企业规模",{"key":23,"text":40,"correct":21},"业务总量",{"key":27,"text":42,"correct":25},"财务子目标",{"key":30,"text":44,"correct":21},"人力资源",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},940636,"(2018年真题)下列园区规划的要求汇总，符合绿色发展原则的是（）。",[49,51,53,55],{"key":19,"text":50,"correct":25},"水土资源不超载",{"key":23,"text":52,"correct":21},"投资额度要达标",{"key":27,"text":54,"correct":21},"分工协作应强化",{"key":30,"text":56,"correct":21},"规划布局要灵活",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},940637,"(2018年真题)关于价值链分析在企业规划中应用的说法，正确的是（ ）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"价值链分析不利于提高作业业绩，但可指导企业未来发展",{"key":23,"text":64,"correct":25},"运用价值链分析可引导企业的投资选择",{"key":27,"text":66,"correct":21},"运用价值链分析的关键是对企业正在经营环节中的成本和效益进行平均分配",{"key":30,"text":68,"correct":21},"通过价值链分析可以将收入分配到“低价值的作业”中",{"id":70,"libraryId":5,"type":71,"typeLabel":72,"stem":73,"options":74,"answer":86,"analysis":32},940638,2,"多选题","(2017年真题)园区发展规划报告中，综合防灾规划的内容包括()",[75,77,79,81,83],{"key":19,"text":76,"correct":25},"人防规划",{"key":23,"text":78,"correct":25},"消防规划",{"key":27,"text":80,"correct":25},"防震减灾规划",{"key":30,"text":82,"correct":25},"防洪规划",{"key":84,"text":85,"correct":21},"E","防易爆危险品规划","ABCD",{"id":88,"libraryId":5,"type":71,"typeLabel":72,"stem":89,"options":90,"answer":101,"analysis":32},940639,"(2017年真题)关于企业规划中对标分析的说法，正确的有()。",[91,93,95,97,99],{"key":19,"text":92,"correct":21},"可将外部企业的未来业绩目标作为自身企业的内部发展目标",{"key":23,"text":94,"correct":25},"可将竞争对手作为标杆，比较经营战略的组成要素",{"key":27,"text":96,"correct":21},"可将行业平均水平为标杆作为自己的对比目标",{"key":30,"text":98,"correct":25},"可将客户需求作为标杆，查找自身的不足并及时改进",{"key":84,"text":100,"correct":25},"可跨行业选择恰当的技术标杆，以利于技术的跨行业渗透","BDE",{"id":103,"libraryId":5,"type":71,"typeLabel":72,"stem":104,"options":105,"answer":116,"analysis":32},940640,"(2018年真题)关于产业规划作用的说法，正确的有（ ）。",[106,108,110,112,114],{"key":19,"text":107,"correct":25},"引导产业发展方向的依据",{"key":23,"text":109,"correct":21},"确定项目投资规模的依据",{"key":27,"text":111,"correct":21},"确定项目融资方案的依据",{"key":30,"text":113,"correct":25},"完善和优化产业结构",{"key":84,"text":115,"correct":25},"促进资源的合理配罝","ADE",{"id":118,"libraryId":5,"type":71,"typeLabel":72,"stem":119,"options":120,"answer":131,"analysis":32},940641,"(2018年真题)下列策略及做法中，符合企业规划编制原则的有（ ）。",[121,123,125,127,129],{"key":19,"text":122,"correct":21},"按照同类企业的成功战略编制",{"key":23,"text":124,"correct":25},"履行社会职责，同时着力于企业价值最大化",{"key":27,"text":126,"correct":25},"立足于企业长远发展",{"key":30,"text":128,"correct":25},"根据行业特点进行规划",{"key":84,"text":130,"correct":25},"充分体现创新性","BCDE",{"id":133,"libraryId":5,"type":9,"typeLabel":15,"stem":134,"options":135,"answer":30,"analysis":32},940643,"(2018年真题)下列项目可行性研究报告编制的内容中，不属于产品竞争力分析编制内容的是（）。",[136,138,140,142],{"key":19,"text":137,"correct":21},"目标市场选择",{"key":23,"text":139,"correct":21},"产品质量与结构分析",{"key":27,"text":141,"correct":21},"成本与盈利分析",{"key":30,"text":143,"correct":25},"风险因素识别",{"id":145,"libraryId":5,"type":9,"typeLabel":15,"stem":146,"options":147,"answer":19,"analysis":32},940644,"(2018年真题)关于项目可行性研究中技术方案选择的说法，正确的是（）。",[148,150,152,154],{"key":19,"text":149,"correct":25},"技术方案选择要考虑所选择技术的技术经济指标",{"key":23,"text":151,"correct":21},"技术改造项目不需进行方案比选",{"key":27,"text":153,"correct":21},"引进技术应尽可能全套引进",{"key":30,"text":155,"correct":21},"技术选择应优先考虑投资节省",{"id":157,"libraryId":5,"type":9,"typeLabel":15,"stem":158,"options":159,"answer":27,"analysis":32},940645,"(2018年真题)项目可行性研究报告及结论的作用的说法，正确的是（）。",[160,162,164,166],{"key":19,"text":161,"correct":21},"可行性研究报告是政府投资主管部门核准项目的依据",{"key":23,"text":163,"correct":21},"可行性研究报告是进行项目施工图设计的依据",{"key":27,"text":165,"correct":25},"可行性研究结论是，权益资金出资人出资决策的依据",{"key":30,"text":167,"correct":21},"可行性研究结论是取得安全生产许可证的依据",{"id":169,"libraryId":5,"type":9,"typeLabel":15,"stem":170,"options":171,"answer":27,"analysis":32},940646,"(2018年真题)关于项目可行性研究中环境保护内容的说法，正确的是（）。",[172,174,176,178],{"key":19,"text":173,"correct":21},"可行性研究不应受环评批复文件的影响",{"key":23,"text":175,"correct":21},"环境质量现状分析只考虑项目界区内",{"key":27,"text":177,"correct":25},"环境保护编制内容中应说明环保投资",{"key":30,"text":179,"correct":21},"环境保护编制内容不应考虑环境监测",{"id":181,"libraryId":5,"type":9,"typeLabel":15,"stem":182,"options":183,"answer":23,"analysis":32},940647,"(2018年真题)关于工程方案中防震抗震编制内容及要求的说法，正确的是（）。",[184,186,188,190],{"key":19,"text":185,"correct":21},"抗震设防是指建筑物的设防",{"key":23,"text":187,"correct":25},"需提出设计基本地震加速度",{"key":27,"text":189,"correct":21},"抗震措施应结合工程结构特征，不考虑地质特征",{"key":30,"text":191,"correct":21},"工业项目厂址不应选择在需要地震设防的地区",{"id":193,"libraryId":5,"type":9,"typeLabel":15,"stem":194,"options":195,"answer":30,"analysis":32},940648,"(2018年真题)关于非经营性项目财务分析的说法，正确的是（）。",[196,198,200,202],{"key":19,"text":197,"correct":21},"对有营业收入的项目，应按照竞争性项目进行财务分析",{"key":23,"text":199,"correct":21},"对没有营业收入的项目，不需要考察财务可持续性",{"key":27,"text":201,"correct":21},"难以货币化的项目，无法进行财务分析",{"key":30,"text":203,"correct":25},"有营业收入的项目，其收入应优先用于支付运营维护成本",{"id":205,"libraryId":5,"type":71,"typeLabel":72,"stem":206,"options":207,"answer":218,"analysis":32},940649,"(2018年真题)下列项目的可行性研究中，主要借助经济分析进行决策的项目有（）。",[208,210,212,214,216],{"key":19,"text":209,"correct":25},"农业开发项目",{"key":23,"text":211,"correct":25},"交通运输项目",{"key":27,"text":213,"correct":21},"商品住宅开发项目",{"key":30,"text":215,"correct":25},"水利资源开发项目",{"key":84,"text":217,"correct":21},"机械加工基地开发项自","ABD",{"id":220,"libraryId":5,"type":71,"typeLabel":72,"stem":221,"options":222,"answer":233,"analysis":32},940650,"(2018年真题)关于项目厂（场）址选择的说法，正确的有（）。",[223,225,227,229,231],{"key":19,"text":224,"correct":25},"厂（场）址选择应考虑项目投资",{"key":23,"text":226,"correct":25},"厂（场）址选择应符合所在地区的规划",{"key":27,"text":228,"correct":25},"厂（场）址选择应考虑运行费用",{"key":30,"text":230,"correct":21},"在开发区建设的项目不需要进行厂（场）址比选",{"key":84,"text":232,"correct":25},"特殊化学品的厂（场）址选择应符合国家有关专项规范","ABCE",{"id":235,"libraryId":5,"type":71,"typeLabel":72,"stem":236,"options":237,"answer":248,"analysis":32},940651,"(2018年真题)关于项目可行性研究报告中全厂运输的说法，正确的有（）。",[238,240,242,244,246],{"key":19,"text":239,"correct":21},"工厂内不应建设铁路运输设施",{"key":23,"text":241,"correct":21},"全场运输应全部依托合建运输力量",{"key":27,"text":243,"correct":25},"全场运输量表中应说明货物的包装方式",{"key":30,"text":245,"correct":21},"厂区内应考虑人流和货流同道以节省土地",{"key":84,"text":247,"correct":25},"易燃、易爆物品运输应制定特别运输方案","CE",{"id":250,"libraryId":5,"type":9,"typeLabel":15,"stem":251,"options":252,"answer":30,"analysis":32},940652,"(2018年真题)对企业申请中央预算内投资补助的资金申请报告进行评估时，不需要评估的内容为（ ）",[253,255,257,259],{"key":19,"text":254,"correct":21},"是否符合中央预算内投资使用的方向",{"key":23,"text":256,"correct":21},"是否符合投资补助安排的原则",{"key":27,"text":258,"correct":21},"是否基本落实主要建设条件",{"key":30,"text":260,"correct":25},"政府补贴的资金数额",{"id":262,"libraryId":5,"type":9,"typeLabel":15,"stem":263,"options":264,"answer":30,"analysis":32},940653,"(2018年真题)对企业投资项目申请书进行核准评估时，不需要评估的内容是（ ）",[265,267,269,271],{"key":19,"text":266,"correct":21},"申报单位是否具备承担项目的能力",{"key":23,"text":268,"correct":21},"拟建项目是否符合行业淮入标准",{"key":27,"text":270,"correct":21},"拟建项目是否对行业发展、区域经济产生影响",{"key":30,"text":272,"correct":25},"项目建设及运营模式是否与企业发展战略相适应",{"id":274,"libraryId":5,"type":9,"typeLabel":15,"stem":275,"options":276,"answer":30,"analysis":32},940654,"(2018年真题)关于项目评估质量控制的说法，正确的是（ ）",[277,279,281,283],{"key":19,"text":278,"correct":21},"项目评话质量控制的目的是确保咨询项目通过评审",{"key":23,"text":280,"correct":21},"项目评估质量控制工作的第一步是验收顾客提供的资料",{"key":27,"text":282,"correct":21},"项目评估质量控制的流程的最终环节是组织专家评审",{"key":30,"text":284,"correct":25},"项目评估质量控制的工作重点之一是配备合格的项目经理",{"id":286,"libraryId":5,"type":71,"typeLabel":72,"stem":287,"options":288,"answer":299,"analysis":32},940655,"(2018年真题)关于国家发展改革委委托咨询评估的说法，正确的有（）。",[289,291,293,295,297],{"key":19,"text":290,"correct":21},"报国务院审批的发展建设规划不属于国家发展改革委委托评估范畴",{"key":23,"text":292,"correct":21},"由国家发展改革委委托评估的项目，应依据项目性质选择评估大纲",{"key":27,"text":294,"correct":25},"评估机构与项目业主单位存在控股关系时，评估机构应回避",{"key":30,"text":296,"correct":25},"特殊项目的咨询评估任务，国家发展改革委可以通过指定方式确定评估机构",{"key":84,"text":298,"correct":21},"委托评估任务时，应首先根据评估机构在行业内的排名对其进行初始排队","CD",{"id":301,"libraryId":5,"type":9,"typeLabel":15,"stem":302,"options":303,"answer":23,"analysis":32},940657,"(2018年真题)根据《政府和社会资本合作项目财政承受能力论证指引》，在财政承受能力评估时，政府年度财政预算支出中用于政府和社会资本合作（PPP）项目的支出与一般公共预算支出的比例上限是（ ）。",[304,306,308,310],{"key":19,"text":305,"correct":21},"5%",{"key":23,"text":307,"correct":25},"10%",{"key":27,"text":309,"correct":21},"15%",{"key":30,"text":311,"correct":21},"20%",{"id":313,"libraryId":5,"type":9,"typeLabel":15,"stem":314,"options":315,"answer":30,"analysis":32},940658,"(2018年真题)下列指标中，属于政府和社会资本合作（PPP）项目物有所值定性评价基本指标的是（ ）。",[316,318,320,322],{"key":19,"text":317,"correct":21},"项目规模",{"key":23,"text":319,"correct":21},"全生命周期成本",{"key":27,"text":321,"correct":21},"运营收入正常潜力",{"key":30,"text":323,"correct":25},"全生命周期整合程度",{"id":325,"libraryId":5,"type":9,"typeLabel":15,"stem":326,"options":327,"answer":19,"analysis":32},940659,"(2018年真题)政府和社会资本合作（PPP）项目物有所值评价中采取PPP值PSC 值进行比较，其中PSC 值的确定一般应参照（ ）。",[328,330,332,334],{"key":19,"text":329,"correct":25},"项目的建设和运营维护净成本，竞争性中立调整值、项目全部风险成本",{"key":23,"text":331,"correct":21},"项目的建设成本，竞争性中立调整值，项目全部风险成本",{"key":27,"text":333,"correct":21},"项目的建设和运营维护净成本，竞争性中立调整值，社会资本的风险成本",{"key":30,"text":335,"correct":21},"项目的建设成本、竞争性中立调整值，政府自留的风险成本",{"id":337,"libraryId":5,"type":9,"typeLabel":15,"stem":338,"options":339,"answer":19,"analysis":32},940660,"(2018年真题)下列建设项目中，仅从项目类型上考虑，最适宜采用政府和社会资本合作（PPP）模式建设的是（ ）。",[340,342,344,346],{"key":19,"text":341,"correct":25},"某二线城市的综合管廊建设项目",{"key":23,"text":343,"correct":21},"某化工企业的改扩建工程",{"key":27,"text":345,"correct":21},"某房地产开发企业拟建设的度假村项目",{"key":30,"text":347,"correct":21},"某自来水厂的技术改造项目",{"id":349,"libraryId":5,"type":71,"typeLabel":72,"stem":350,"options":351,"answer":362,"analysis":32},940661,"(2018年真题)关于政府和社会资本合作（PPP）项目物有所值评价的说法，正确的有（ ）。",[352,354,356,358,360],{"key":19,"text":353,"correct":21},"物有所値评价必须进行定量评价",{"key":23,"text":355,"correct":25},"政府机构能力是物有所值评价内容之一",{"key":27,"text":357,"correct":25},"物有所值评价是判断项目是否采用PPP模式实施的决策基础",{"key":30,"text":359,"correct":25},"定量评价的前提是假定PPP模式和政府传统投资模式的产出绩效相同",{"key":84,"text":361,"correct":21},"物有所值验证只有一次机会，一旦不能通过，就不再采用PPP模式","BCD",{"id":364,"libraryId":5,"type":71,"typeLabel":72,"stem":365,"options":366,"answer":377,"analysis":32},940662,"(2018年真题)下列策略或做法中、符合政府与社会资本合作（PPP）项目实施方案编制应遵循的原则有（ ）。",[367,369,371,373,375],{"key":19,"text":368,"correct":25},"尊重契约精神",{"key":23,"text":370,"correct":25},"统筹近期和远期关系",{"key":27,"text":372,"correct":25},"宏观和微观相结合",{"key":30,"text":374,"correct":21},"政府资本优先获利",{"key":84,"text":376,"correct":21},"政府承担项目市场风险","ABC",{"id":379,"libraryId":5,"type":9,"typeLabel":15,"stem":380,"options":381,"answer":19,"analysis":32},940663,"(2010年真题) 下列关于投资项目建设规模的说法，正确的是()",[382,384,386,388],{"key":19,"text":383,"correct":25},"单位投资利润是衡量项目经济规模的指标之一",{"key":23,"text":385,"correct":21},"产品市场需求变化较快时应采用中、大规模战略",{"key":27,"text":387,"correct":21},"项目建设规模的确定只需考虑污染物达标扫做的问题",{"key":30,"text":389,"correct":21},"民族关系和军事国防不属于项目建设规模研究应考虑的因素",{"id":391,"libraryId":5,"type":9,"typeLabel":15,"stem":392,"options":393,"answer":19,"analysis":32},940664,"(2009年真题) 投资项目场(厂)址比选的主要内容包括建设条件、投资费用、运营费用、环境保护条件和()",[394,396,398,400],{"key":19,"text":395,"correct":25},"安全条件",{"key":23,"text":397,"correct":21},"招标条件",{"key":27,"text":399,"correct":21},"施工条件",{"key":30,"text":401,"correct":21},"生活条件",{"id":403,"libraryId":5,"type":9,"typeLabel":15,"stem":404,"options":405,"answer":30,"analysis":32},940665,"(2012年真题) 建设方案研究内容不包括(）",[406,408,410,412],{"key":19,"text":407,"correct":21},"组织机构与人力资源配置",{"key":23,"text":409,"correct":21},"项目进度计划",{"key":27,"text":411,"correct":21},"原材料及燃料供应",{"key":30,"text":413,"correct":25},"资金筹措方案",{"id":415,"libraryId":5,"type":9,"typeLabel":15,"stem":416,"options":417,"answer":27,"analysis":32},940666,"(2012年真题) 关于项目建设方案研究中建设规模的说法;正确的是()",[418,420,422,424],{"key":19,"text":419,"correct":21},"建设规模由国家产业政策决定",{"key":23,"text":421,"correct":21},"建设规模应根据市场容量确定，建设规模越大越好",{"key":27,"text":423,"correct":25},"合理的经济规模可以使项目获得最佳的经济效益",{"key":30,"text":425,"correct":21},"市场确定后‘建设规模的决定因素是资金筹集额",{"id":427,"libraryId":5,"type":9,"typeLabel":15,"stem":428,"options":429,"answer":27,"analysis":32},940667,"(2012年真题) 投资项目建设方案所采用的高新技术，应符合先进性、创新性、成熟性和0的要求。",[430,432,434,436],{"key":19,"text":431,"correct":21},"唯一性",{"key":23,"text":433,"correct":21},"垄断性",{"key":27,"text":435,"correct":25},"实用性",{"key":30,"text":437,"correct":21},"独特性",{"id":439,"libraryId":5,"type":9,"typeLabel":15,"stem":440,"options":441,"answer":27,"analysis":32},940668,"(2009年真题)某投资项目建设投资估算为2亿元，总用地面积5公顷，项日建(构)筑物占地20000平方米，其中消防水池占地3333平方米。(建设99年真题)则建筑系数为().",[442,444,446,448],{"key":19,"text":443,"correct":21},"6.6%",{"key":23,"text":445,"correct":21},"33.3%",{"key":27,"text":447,"correct":25},"40.0%",{"key":30,"text":449,"correct":21},"46.7%",{"id":451,"libraryId":5,"type":9,"typeLabel":15,"stem":452,"options":453,"answer":19,"analysis":32},940669,"(2011年真题)某建设项目总占地面积为100000m2,建有四座建筑面积均为6000m2的单层库房，其中两座层高为6m，另外两座层高分别为9m和10m，还有一个占地面积为5000m2的露天堆场.该项目的容积率是().",[454,456,458,460],{"key":19,"text":455,"correct":25},"0.36",{"key":23,"text":457,"correct":21},"0.3",{"key":27,"text":459,"correct":21},"0.29",{"key":30,"text":461,"correct":21},"0.24",{"id":463,"libraryId":5,"type":9,"typeLabel":15,"stem":464,"options":465,"answer":27,"analysis":32},940670,"(2018年真题)某厂区设计方案中，厂房、办公楼占地面积6000m2，露天堆场占地面积2000m2原材料和燃料堆场占地面较1000m2，场区道路占地面积800m2，其他占地面积1500m2，则该厂区的建筑系数是（）。",[466,468,470,472],{"key":19,"text":467,"correct":21},"53.10%",{"key":23,"text":469,"correct":21},"70.80%",{"key":27,"text":471,"correct":25},"79.65%",{"key":30,"text":473,"correct":21},"85.71%",{"id":475,"libraryId":5,"type":9,"typeLabel":15,"stem":476,"options":477,"answer":23,"analysis":32},940671,"(2018年真题)有甲、乙、丙三个独立项目，寿命期相同，初始投资额、年净收益、挣现值见下表，己知行业财务基准收益率力10%，投资人的资金限制为1000万元，用净现值法选择的项目是（）。",[478,480,482,484],{"key":19,"text":479,"correct":21},"甲和乙",{"key":23,"text":481,"correct":25},"乙和丙",{"key":27,"text":483,"correct":21},"甲和丙",{"key":30,"text":485,"correct":21},"甲、乙和丙",{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":27,"analysis":32},940672,"(2018年真题)某企业享有资金1.8亿元，有六个独立且可行的项目供选择，其投资额分别2500、3000、3200、4000、4500、4800万元。为最大程度利用现有资金，进行方案选择时最适宜的方法是（）。",[490,492,494,496],{"key":19,"text":491,"correct":21},"投资回收期比较法",{"key":23,"text":493,"correct":21},"内部收益率排序法",{"key":27,"text":495,"correct":25},"互斥方案组合法",{"key":30,"text":497,"correct":21},"费用\u002F效益比较法",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":19,"analysis":32},940673,"(2018年真题)某市政道路项目，由两个备选方案，效果相同，甲方案投资1150 万元，年维护费用100 万元，寿命期15；乙方案投资860 万元，年维护费用180 万元，寿命期12。则该项目方案比选最适宜的方法是（ ）。",[502,504,506,508],{"key":19,"text":503,"correct":25},"费用年值法",{"key":23,"text":505,"correct":21},"净现值率法",{"key":27,"text":507,"correct":21},"效益\u002F费用比较法",{"key":30,"text":509,"correct":21},"内部收益率比较大",{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":19,"analysis":32},940674,"(2018年真题)某项目有四个备选方案，各方案计算期相同，己知行业财务基准收益率为8%，各方案的数据见下表： 则该项目的最佳方案是（ ）。",[514,516,518,520],{"key":19,"text":515,"correct":25},"甲",{"key":23,"text":517,"correct":21},"乙",{"key":27,"text":519,"correct":21},"丙",{"key":30,"text":521,"correct":21},"丁",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":19,"analysis":32},940675,"(2018年真题)关于一般工业项目厂（场）址选择要求的说法，错误的是（ ）。",[526,528,530,532],{"key":19,"text":527,"correct":25},"必须靠近原料地以降低原料运输成本",{"key":23,"text":529,"correct":21},"具有便利的外部交通条件",{"key":27,"text":531,"correct":21},"符合城乡总体规划和环境保护规划要求",{"key":30,"text":533,"correct":21},"有利于生产协作和上下游加工一体化",{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":30,"analysis":32},940676,"(2018年真题)关于危险性废物填埋场选址的说法，正确的是（ ）。",[538,540,542,544],{"key":19,"text":539,"correct":21},"地下水位应在不透水层1米以下",{"key":23,"text":541,"correct":21},"必须有足够大的可使用面积以保证填埋场建成后具有5年或更长的使用期",{"key":27,"text":543,"correct":21},"场址必需位于50年一遇洪水高线以上",{"key":30,"text":545,"correct":25},"应避开破坏性地震及活动构造区",{"id":547,"libraryId":5,"type":9,"typeLabel":15,"stem":548,"options":549,"answer":23,"analysis":32},940677,"(2018年真题)某常规投资项目，当折现率为8%时，财务净现值为320 万元；当折现率为10%时，财务净现值为-160 万元。己知该行业财务基准收益率ic 为12%。关于该项目内部收益率IRR 的说法，正确的是（ ）",[550,552,554,556],{"key":19,"text":551,"correct":21},"可推断IRR＞ic，说明项目可行",{"key":23,"text":553,"correct":25},"可推断IRR＜ic，说明项目不可行",{"key":27,"text":555,"correct":21},"无法推断IRR大小，是否可行需要进一步判断",{"key":30,"text":557,"correct":21},"IRR的大小自主决定",{"id":559,"libraryId":5,"type":9,"typeLabel":15,"stem":560,"options":561,"answer":23,"analysis":32},940678,"(2008年真题) 某投资项目建设投资2亿元，总用地面积5公顷，其中行政办公生活服务设施用地面积3000平方米， 占比是( )。",[562,564,566,568],{"key":19,"text":563,"correct":21},"0.17%",{"key":23,"text":565,"correct":25},"6.00%",{"key":27,"text":567,"correct":21},"17.00%",{"key":30,"text":569,"correct":21},"60.00%",{"id":571,"libraryId":5,"type":9,"typeLabel":15,"stem":572,"options":573,"answer":23,"analysis":32},940679,"（2013年真题）关于项目布局选址的说法、正确的是（ ）。",[574,576,578,580],{"key":19,"text":575,"correct":21},"产业集中布局，会增加污染物治理的难度",{"key":23,"text":577,"correct":25},"产业集中布局，会提高资源资源综合利用水平",{"key":27,"text":579,"correct":21},"行业集聚，会加剧竞争，提高产品成本",{"key":30,"text":581,"correct":21},"形成集聚效应，物流加大，会增加能量耗损",{"id":583,"libraryId":5,"type":71,"typeLabel":72,"stem":584,"options":585,"answer":248,"analysis":32},940680,"(2018年真题)关于采用投资回收期指标进行方案评价的说法，正确的有（）。",[586,588,590,592,594],{"key":19,"text":587,"correct":21},"投资回收期考虑了方案整个寿命期的收益，比较客观",{"key":23,"text":589,"correct":21},"投资回收期小于基准投资回收期是项目可行的充分条件",{"key":27,"text":591,"correct":25},"投资回收期不能反应项自投资回收之后的情况",{"key":30,"text":593,"correct":21},"投资回收期越短，说明项目效益越好",{"key":84,"text":595,"correct":25},"动态投资回收期是项目净现金流量累计现值等于零所需要的时间",{"id":597,"libraryId":5,"type":71,"typeLabel":72,"stem":598,"options":599,"answer":610,"analysis":32},940681,"(2009年真题) 投资项目生产工艺技术选择应遵循的经济合理性原则，主要体现在()等方面。",[600,602,604,606,608],{"key":19,"text":601,"correct":25},"消耗少",{"key":23,"text":603,"correct":21},"投资大",{"key":27,"text":605,"correct":25},"成本低",{"key":30,"text":607,"correct":21},"利润低",{"key":84,"text":609,"correct":25},"利润高","ACE",{"id":612,"libraryId":5,"type":71,"typeLabel":72,"stem":613,"options":614,"answer":377,"analysis":32},940682,"(2012年真题) 关于建设方案比选的说法中正确的是()",[615,617,619,621,623],{"key":19,"text":616,"correct":25},"比选指标体系包括技术层面、经济层面和社会层面",{"key":23,"text":618,"correct":25},"建设方案比选应以可靠、可比的数据为基础",{"key":27,"text":620,"correct":25},"建设方案的比较方法包括定性分析和定量分析方法",{"key":30,"text":622,"correct":21},"公共卫生等部门建设项目其方案比较的主要层面是社会层面和经济层面",{"key":84,"text":624,"correct":21},"比选指标中不能用技术经济指标表达的，由专家组进行定J性分析，采用加权或不加权的计分方法",{"id":626,"libraryId":5,"type":71,"typeLabel":72,"stem":627,"options":628,"answer":610,"analysis":32},940683,"(2009年真题)投资项目建设方案研究的主耍任务有（）",[629,631,633,635,637],{"key":19,"text":630,"correct":25},"选择性能可靠的生产设备",{"key":23,"text":632,"correct":21},"选择最佳的资金筹措方案",{"key":27,"text":634,"correct":25},"选择先进适用的工艺技术",{"key":30,"text":636,"correct":21},"选择适宜的投资使用计划",{"key":84,"text":638,"correct":25},"选择合理的总图布置方案",{"id":640,"libraryId":5,"type":71,"typeLabel":72,"stem":641,"options":642,"answer":131,"analysis":32},940684,"(2010年真题) 适用性原则是选择生产工艺技术应遵循的原则之一。适用性主要体现在()等方面。",[643,645,647,649,651],{"key":19,"text":644,"correct":21},"生产工艺技术选择应使工艺技术流程短、自动化程度高",{"key":23,"text":646,"correct":25},"生产工艺技木选择应符合环境保护要求",{"key":27,"text":648,"correct":25},"生产工艺技术选择应与原材料、燃半娇口辅助材料的供应相匹配",{"key":30,"text":650,"correct":25},"生产工艺技术选择应与员工的素质和管理水平相适应",{"key":84,"text":652,"correct":25},"生产工艺技术选择应与国内外供应的设备在性能上相适应",{"id":654,"libraryId":5,"type":71,"typeLabel":72,"stem":655,"options":656,"answer":667,"analysis":32},940685,"(2011年真题) 建设方案研究中，生产工艺技术的选择应符合”适用性“原则。下列方案设计要求中，符合”适用性“原则的有()。",[657,659,661,663,665],{"key":19,"text":658,"correct":25},"满足环保要求",{"key":23,"text":660,"correct":21},"工艺技术淑呈短",{"key":27,"text":662,"correct":21},"工艺技术水平高",{"key":30,"text":664,"correct":21},"长周期稳定运行",{"key":84,"text":666,"correct":25},"与生产规模相匹配","AE",[669,672,675,678,681,684],{"id":9,"name":670,"category":7,"favorite":671},"领导干部任职前廉政法规知识测试题",92,{"id":673,"name":674,"category":7,"favorite":9},595,"建筑结构与设备",{"id":676,"name":677,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":679,"name":680,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":682,"name":683,"category":7,"favorite":8},534,"BIM工程师",{"id":685,"name":683,"category":7,"favorite":8},535]