[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941948":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941948,608,1,"单选题","项目后评价的依据不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","理论依据",false,{"key":16,"text":17,"correct":14},"B","政策制度依据",{"key":19,"text":20,"correct":14},"C","信息数据依据",{"key":22,"text":23,"correct":24},"D","风险决策依据",true,"考点:项目后评价的依据。项目后评价的依据包括：理论依据，政策制度依据，信息数据依据。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]