[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941947":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},941947,608,1,"单选题","下列关于中间评价和后评价的区别与联系说法错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","两者实施的时间不同",false,{"key":16,"text":17,"correct":14},"B","评价深度和相应的指标不同",{"key":19,"text":20,"correct":21},"C","服务的作用和功能相同",true,{"key":23,"text":24,"correct":14},"D","两者项目的目标评价.效益评价是一致的","考点:项目后评价的类型。项目中间评价和项目后评价都是项目全过程管理的重要组成部分，二者既有共同点，也有不同点；既相对独立又紧密联系。一方面，由于两者实施的时间不同，评价深度和相应的一些指标也不同；它们服务的作用和功能也有所不同。另一方面，中间评价和后评价也有许多共同点，如项目的目标评价、效益评价等是一致的。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]