[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941945":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941945,608,2,"多选题","项目建设准备阶段回顾与评价内容有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","勘察设计",true,{"key":16,"text":17,"correct":14},"B","采购招标",{"key":19,"text":20,"correct":14},"C","合同签订",{"key":22,"text":23,"correct":24},"D","生产准备",false,{"key":26,"text":27,"correct":24},"E","合同执行与管理","ABC","考点:项目建设全过程回顾与评价。项目建设准备阶段回顾与评价内容有：勘察设计，融资方案，采购招标，合同签订，开工准备。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]