[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941936":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941936,608,1,"单选题","需要提出一份单独的项目环境影响后评价报告的项目不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目位于环境高度敏感的地区",false,{"key":16,"text":17,"correct":18},"B","项目可能造成重大环境影响",true,{"key":20,"text":21,"correct":14},"C","项目已发生严重的污染事件",{"key":23,"text":24,"correct":14},"D","项目生产或使用对人类和生态有极大危害的剧毒物品","考点:项目效果效益评价和项目影响评价。如果项目生产或使用对人类和生态有极大危害的剧毒物品，或项目位于环境高度敏感的地区，或项目已发生严重的污染事件，那么还需要提出一份单独的项目环境影响后评价报告。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]