[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941929":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941929,608,2,"多选题","项目中间评价又根据启动时点不同，包括项目实施过程中从立项到项目完成前很多种类，其中包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目评估",false,{"key":16,"text":17,"correct":18},"B","开工评价",true,{"key":20,"text":21,"correct":14},"C","项目后评价",{"key":23,"text":24,"correct":18},"D","阶段评价",{"key":26,"text":27,"correct":18},"E","完工评价","BDE","考点:项目后评价的类型。项目中间评价又根据启动时点不同，包括项目实施过程中从立项到项目完成前很多种类，即项目的开工评价、跟踪评价、调概评价、特定阶段评价、完工评价等。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]