[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941926":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},941926,608,1,"单选题","下列不属于项目建设实施阶段的后评价内容的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","采购招标评价",true,{"key":16,"text":17,"correct":18},"B","合同执行评价",false,{"key":20,"text":21,"correct":18},"C","实施过程的监督管理评价",{"key":23,"text":24,"correct":18},"D","资金使用评价","考点:项目建设全过程回顾与评价。项目建设实施阶段：合同执行与管理，重大设计变更，“四大管理”，资金使用与管理，实施过程的监督管理，建设期的组织与管理。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]