[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941919":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941919,608,1,"单选题","在开展项目前期策划时，（ ）是决策分析与评价的最基本要求。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","贯彻落实科学发展观",false,{"key":16,"text":17,"correct":18},"B","资料数据准确可靠",true,{"key":20,"text":21,"correct":14},"C","方法科学",{"key":23,"text":24,"correct":14},"D","多方案比较与优化","考点:项目前期策划的任务及基本要求。全面、准确地了解和掌握有关项目决策分析与评价的资料数据是决策分析与评价的最基本要求。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]