[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941915":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941915,608,2,"多选题","不同性质、不同类型的工程项目，其目标和评价标准有所不同，但一般应考虑的基本方面包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程咨询成果与委托单位要求的满意性",true,{"key":16,"text":17,"correct":14},"B","工程咨询成果与各方利益权衡的协调性",{"key":19,"text":20,"correct":14},"C","工程咨询成果与国家有关法律法规政策的符合性",{"key":22,"text":23,"correct":14},"D","工程咨询成果与国民经济和社会事业发展目标的一致性",{"key":25,"text":26,"correct":27},"E","工程咨询成果对产业创新发展的促进性",false,"ABCD","考点:项目前期咨询成果的质量保证。由于建设项目前期咨询成果很难用定量标准来衡量和评价，一般应考虑下列基本方面：（1）工程咨询成果与国家有关法律法规政策的符合性； （2）项目前期咨询成果与国民经济和社会事业发展目标的一致性；（3）委托者对项目前期咨询成果的满意性；（4）项目前期咨询成果与各方利益权衡的协调性。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]