[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941912":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941912,608,2,"多选题","项目决策分析与评价要求动态与静态的分析方法相结合，其中动态分析的指标包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","投资回收期",false,{"key":16,"text":17,"correct":18},"B","内部收益率",true,{"key":20,"text":21,"correct":18},"C","净现值",{"key":23,"text":24,"correct":18},"D","净年值",{"key":26,"text":27,"correct":14},"E","总投资收益率","BCD","考点:项目决策分析与评价的任务和基本要求。动态分析方法将不同时点的现金流人和流出换算成同一时点的价值，为不同项目、不同方案的比较提供可比的基础。动态分析指标主要有内部收益率、净现值、净年值等指标。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]