[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941867":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941867,608,1,"单选题","下列不属于项目申请报告内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","规划布局",false,{"key":16,"text":17,"correct":14},"B","资源利用",{"key":19,"text":20,"correct":14},"C","征地移民",{"key":22,"text":23,"correct":24},"D","技术方案",true,"考点:项目前期咨询成果的相互关系。项目申请报告主要是从规划布局、资源利用、征地移民、生态环境、经济和社会影响等方面对拟建项目进行论证，选项 D 属于可行性研究报告的内容。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]