[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941777":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},941777,608,1,"单选题","在建设项目运营阶段，社会评价关注的重点是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","从社会层面论证项目的可行性",false,{"key":16,"text":17,"correct":14},"B","对前期阶段完成的评价结论作进一步的分析和修正",{"key":19,"text":20,"correct":21},"C","判断受影响群体对项目的真实反应",true,{"key":23,"text":24,"correct":14},"D","对已经发生的影响和相关反应作出分析","考点:项目不同阶段社会评价的工作重点。选项 A 是项目前期阶段的社会评价重点，选项 B 是项目准备阶段的社会评价重点，选项 D 是项目实施阶段的社会评价重点",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]