[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941744":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941744,608,1,"单选题","下列属于项目选址内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目土地使用情况",false,{"key":16,"text":17,"correct":14},"B","土地利用条件",{"key":19,"text":20,"correct":14},"C","项目场址的影响",{"key":22,"text":23,"correct":24},"D","场址方案",true,"考点:项目申请报告的编制内容和提纲。项目选址包含：建厂条件和场址方案。选项 ABC 是项目占地的内容。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]