[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941736":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941736,608,2,"多选题","项目建设的外部性、公共性事项包括除维护经济安全、合理开发利用资源外还包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","保护生态环境",true,{"key":16,"text":17,"correct":18},"B","优化工艺方案",false,{"key":20,"text":21,"correct":14},"C","优化重大布局",{"key":23,"text":24,"correct":14},"D","保障公众利益",{"key":26,"text":27,"correct":14},"E","防止出现垄断","ACDE","考点:项目申请报告的含义和作用及类别。项目建设的外部性、公共性事项，包括维护经济安全、合理开发利用资源、保护生态环境、优化重大布局、保障公众利益、防止出现垄断等，为核准机关对项目进行核准提供依据。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]