[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941721":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},941721,608,1,"单选题","工程方案选择的基本要求不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","保护环境",true,{"key":16,"text":17,"correct":18},"B","满足生产使用功能要求",false,{"key":20,"text":21,"correct":18},"C","符合工程规范要求",{"key":23,"text":24,"correct":18},"D","经济合理","考点:土建工程方案。除选项 BCD 外还有适应已选定的场址（线路走向）。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]