[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941710":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},941710,608,1,"单选题","项目所需原材料的品种、质量和性能应依据（ ）来确定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","产品方案和建设规模方案",false,{"key":16,"text":17,"correct":14},"B","产品方案和物料消耗定额",{"key":19,"text":20,"correct":21},"C","产品方案和工艺技术方案",true,{"key":23,"text":24,"correct":14},"D","建设规模和工艺技术方案","考点:原材料与燃料供应方案。原材料供应根据产品方案和工艺技术方案，研究确定所需原材料的品种、质量、性能。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]