[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941644":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941644,608,1,"单选题","地下工程项目出现前期地质勘察设计与实际施工情况不适应时，将发生项目中断、工期延误、费用增加等风险，属于非系统风险中的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工风险",false,{"key":16,"text":17,"correct":18},"B","设计风险",true,{"key":20,"text":21,"correct":14},"C","管理风险",{"key":23,"text":24,"correct":14},"D","移交风险","考点:非系统风险。设计风险主要指项目设计方案的可靠性、适用性和经济性方面是否能够满足项目建设目标要求的风险。如地下工程项目出现前期地质勘察设计与实际施工情况不适应时，将发生项目中断、工期延误、费用增加等风险。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]