[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941640":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941640,608,1,"单选题","政府和社会资本合作（PPP）项目物有所值评价中，对可行性缺口补助模式的项目，在项目运营补贴期间，政府每年直接付费数额须扣除（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","合理利润",false,{"key":16,"text":17,"correct":14},"B","年均建设成本",{"key":19,"text":20,"correct":14},"C","年度运营成本",{"key":22,"text":23,"correct":24},"D","每年使用者付费数额",true,"考点:物有所值评价。政府每年直接付费数额包括：社会资本方承担的年均建设成本（折算成各年度现值）、年度运营成本和合理利润，再减去每年使用者付费的数额。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]