[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941630":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941630,608,1,"单选题","PPP 项目实施方案风险识别与分配中，属于非系统性风险的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","不可抗力风险",false,{"key":16,"text":17,"correct":14},"B","政策风险",{"key":19,"text":20,"correct":14},"C","经济风险",{"key":22,"text":23,"correct":24},"D","投资控制风险",true,"考点:风险识别与分配。非系统性风险包括：施工风险，设计风险，投资控制风险，管理风险，运营维护风险，移交风险。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]