[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941627":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},941627,608,1,"单选题","PPP 项目实施方案物有所值的定性评价，一般采用的方法是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","专家打分法",true,{"key":16,"text":17,"correct":18},"B","情景分析法",false,{"key":20,"text":21,"correct":18},"C","比例法",{"key":23,"text":24,"correct":18},"D","概率法","考点:物有所值与财政承受能力论证。物有所值的定性评价，一般采用专家打分法",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]