[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941616":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},941616,608,1,"单选题","政府和社会资本合作（PPP）项目实施方案中需进行风险识别与分配。对于前期工作深度较浅、工程施工难度较大的项目，（ ）风险较大。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","经济",false,{"key":16,"text":17,"correct":14},"B","管理",{"key":19,"text":20,"correct":21},"C","投资控制",true,{"key":23,"text":24,"correct":14},"D","运营维护","考点:风险识别与分配。投资控制风险，主要是由于工程方案变动的工程量增加、工期延长，以及物价上涨、各种费率提高、项目管理不当等导致项目总投资增加的风险。例如前期工作深度较浅、工程施工难度较大的项目可能面临此类风险。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]