[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941606":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},941606,608,1,"单选题","PPP 项目实施方案的依据不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","法律及政策依据",false,{"key":16,"text":17,"correct":14},"B","规划依据",{"key":19,"text":20,"correct":21},"C","决策依据",true,{"key":23,"text":24,"correct":14},"D","技术经济指标依据","考点:实施方案的原则、依据和编制的基本要求。PPP 项目实施方案的依据包括法律及政策依据，规划依据和技术经济指标依据。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]