[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941565":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941565,608,1,"单选题","资本运作项目中，BOT 类项目的首要问题是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确定政府介入的程度和方式",false,{"key":16,"text":17,"correct":18},"B","合理确定和选择反映项目风险的贴现率",true,{"key":20,"text":21,"correct":14},"C","风险分析和不确定性分析",{"key":23,"text":24,"correct":14},"D","并购总投资","考点:资本运作项目。首要的问题是合理确定和选择反映项目风险的贴现率。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]