[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941561":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},941561,608,1,"单选题","确定项目资金使用计划和建设期的依据是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目确定的实施计划",true,{"key":16,"text":17,"correct":18},"B","工程方案及配套工程方案",false,{"key":20,"text":21,"correct":18},"C","总图运输",{"key":23,"text":24,"correct":18},"D","建设规模","考点:节能、节水和项目组织与管理。项目确定的实施计划，是确定项目资金使用计划和建设期的依据。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]