[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941517":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941517,608,2,"多选题","B0T 项目可行性研究的重点有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","竞争因素",true,{"key":16,"text":17,"correct":14},"B","消费者需求",{"key":19,"text":20,"correct":21},"C","项目的潜在价值",false,{"key":23,"text":24,"correct":14},"D","盈利稳定性的估计",{"key":26,"text":27,"correct":14},"E","项目回报率","ABDE","考点: B0T 项目可行性研究的重点。可行性研究要重点考虑：政治法律因素；竞争因素，包括业内竞争、新的竞争者加入、替代品的竞争；消费者需求；盈利预测；盈利稳定性的估计和项目回报率。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]