[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941466":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},941466,608,1,"单选题","在整个价值链分析中要以（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","事实为基础，以假设为导向，反复评估修正，以期得到客观的结论",true,{"key":16,"text":17,"correct":18},"B","假设为基础，以事实为导向，反复评估修正，以期得到客观的结论",false,{"key":20,"text":21,"correct":18},"C","事实为基础，以假设为导向，反复评估修正，以期得到主观的结论",{"key":23,"text":24,"correct":18},"D","假设为基础，以事实为导向，反复评估修正，以期得到主观的结论","考点:企业发展规划的分析方法。在整个价值链分析中要以事实为基础，以假设为导向，反复评估修正，以期得到客观的结论。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]