[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941415":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},941415,608,1,"单选题","项目可持续能力分析是后评价的一项重要内容，下列影响项目可持续能力的要素中，属于内部要素的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","资源供给",false,{"key":16,"text":17,"correct":14},"B","市场变化",{"key":19,"text":20,"correct":21},"C","技术竞争力",true,{"key":23,"text":24,"correct":14},"D","生态环境要求","",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]