[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941403,608,1,"单选题","项目目标实现、达到预定目标，即项目建成。某项目对国民经济、社会发展、生态环境产生预定的影响效果，属于“四个建成”中的()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程(实物)建成",false,{"key":16,"text":17,"correct":14},"B","项目技术(能力)建成",{"key":19,"text":20,"correct":14},"C","项目经济(效益)建成",{"key":22,"text":23,"correct":24},"D","项目影响建成",true,"",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]