[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941400":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941400,608,1,"单选题","不同阶段的项目后评价应采集项目进展的最新数据，对前期后评价成果进行修正。这反映了项目后评价的()基本特性。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","全面性",false,{"key":16,"text":17,"correct":18},"B","动态性",true,{"key":20,"text":21,"correct":14},"C","依据的现实性",{"key":23,"text":24,"correct":14},"D","结论的反馈性","",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]