[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941391":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941391,608,2,"多选题","项目后评价的环境影响后评价内容包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目目标评价",false,{"key":16,"text":17,"correct":18},"B","项目污染控制",true,{"key":20,"text":21,"correct":14},"C","项目就业影响",{"key":23,"text":24,"correct":18},"D","项目区域生态平衡",{"key":26,"text":27,"correct":18},"E","项目环境管理能力","BDE","",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]