[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941295":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941295,608,1,"单选题","项目决策过程可以依次分为()四个阶段。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目设想、项目研究、项目设计和项目决策",false,{"key":16,"text":17,"correct":18},"B","信息收集、方案设计、方案评价和方案抉择",true,{"key":20,"text":21,"correct":14},"C","可行性研究、环境影响评价、申请报告和项目核准",{"key":23,"text":24,"correct":14},"D","前评价、中间评价、完工评价和后评价","",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]