[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941291":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941291,608,1,"单选题","未经()审批可行性研究报告或资金申请报告的项目，有关部门和单位不得对外签署贷款协定及银行不予办理相关手续。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","中央银行和财政部",false,{"key":16,"text":17,"correct":14},"B","国务院和中央银行",{"key":19,"text":20,"correct":14},"C","国务院及财务部",{"key":22,"text":23,"correct":24},"D","国务院及国家发展改革委",true,"未经国务院及国家发展改革委审批可行性研究报告或资金申请报告的项目，有关部门和单位不得对外签署贷款协定、协议或合同，外汇管理、税务、海关等部门及银行不予办理相关手续。 为适应新形势下利用国外贷款的新要求，国家发展改革委、财政部《关于国际金融组织和外国政府贷款管理改革有关问题的通知》，要求依据“顶层设计、简政放权、公开透明”的原则，进一步研究优化整合国外贷款管理程序，以充分利用国外优惠贷款资源支持国家重点领域改革。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]