[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941263":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941263,608,2,"多选题","关于项目决策分析与评价方法的说法，错误的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","定量分析与定性分析相结合，以定性分析为主",true,{"key":16,"text":17,"correct":14},"B","动态分析与静态分析相结合，以静态分析为主",{"key":19,"text":20,"correct":21},"C","项目决策与分析应坚持多方案比较与优化",false,{"key":23,"text":24,"correct":21},"D","经验判断法容易受个人主观认识的限制",{"key":26,"text":27,"correct":21},"E","专家评分法是方案比选的方法之一","AB","选项A错误，定量分析与定性分析相结合，以定量分析为主。选项B错误，动态分析与静态分析相结合，以动态分析为主。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]