[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941226":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},941226,608,1,"单选题","为了应对风险接受，可以采取事先制订好后备措施。一旦项目实际进展情况与计划不同，就需动用后备措施，不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预备费措施",false,{"key":16,"text":17,"correct":18},"B","后备措施",true,{"key":20,"text":21,"correct":14},"C","进度后备措施",{"key":23,"text":24,"correct":14},"D","技术后备措施","为了应对风险接受，可以采取事先制订好后备措施。一旦项目实际进展情况与计划不同，就需动用后备措施。主要有费用、进度和技术三种后备措施。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]