[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941221":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941221,608,1,"单选题","已知有风险，但由于可能获利而需要冒险承担该种风险的情况属于风险对策中的()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","风险回避",false,{"key":16,"text":17,"correct":14},"B","风险控制",{"key":19,"text":20,"correct":14},"C","风险转移",{"key":22,"text":23,"correct":24},"D","风险接受",true,"另一种可能是被动的。已知项目有风险，风险事件不影响项目实施，但由于可能获得高额利润而需要冒险，而且此时无法采用其他的合理应对策略，必须被动地保留和承担这种风险。例如，资源开发项目和其他风险投资项目。可能获利而需要冒险时，必须保留和承担该风险。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]