[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941204":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941204,608,2,"多选题","风险估计是估计风险发生的可能性及其对项目的影响，风险估计的方法主要包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","主观概率估计法",true,{"key":16,"text":17,"correct":14},"B","决策矩阵法",{"key":19,"text":20,"correct":21},"C","风险分解法",false,{"key":23,"text":24,"correct":14},"D","概率树分析法",{"key":26,"text":27,"correct":14},"E","蒙特卡洛模拟法","ABDE","㈠风险估计 风险估计是在风险识别后对风险事件发生可能性、风险事件影响范围、风险事件发生的时间和风险后果对项目严重程度所进行的估计。 应采取定性描述与定量分析相结合的方法。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]