[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941161":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941161,608,1,"单选题","根据对项目不同方案的敏感性分析，下列说法正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","敏感分析图纵轴为不确定因素的变化率",false,{"key":16,"text":17,"correct":14},"B","敏感分析图横轴为内部收益率的数值",{"key":19,"text":20,"correct":14},"C","项目某因素的与纵轴的交点即为临界点",{"key":22,"text":23,"correct":24},"D","项目敏感程度小，抗风险能力强",true,"考点:敏感性分析。项目的敏感程度小，表明抗风险能力强。敏感分析图横轴为不确定因素的变化率，纵轴为项目效益指标。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]