[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941137":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941137,608,2,"多选题","需要进行社会评价的投资项目主要包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","外部影响较大的项目",false,{"key":16,"text":17,"correct":18},"B","社会因素比较复杂的项目",true,{"key":20,"text":21,"correct":18},"C","社会矛盾比较突出的项目",{"key":23,"text":24,"correct":18},"D","具有明确社会发展目标的项目",{"key":26,"text":27,"correct":14},"E","产出价格背离真实价值的项目","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]