[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941122":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941122,608,2,"多选题","社会管理方案是社会评价的重要成果，是对项目实施阶段的社会行动、措施及其保障条件的总体性安排。社会管理方案包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","社会调查计划",false,{"key":16,"text":17,"correct":18},"B","利益加强计划",true,{"key":20,"text":21,"correct":18},"C","负面影响减缓计划",{"key":23,"text":24,"correct":18},"D","利益相关者参与计划",{"key":26,"text":27,"correct":18},"E","社会监测评估计划","BCDE","社会管理方案包括利益加强计划、负面影响减缓计划、利益相关者参与计划和社会监测评估计划。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]