[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941076":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},941076,608,1,"单选题","项目评估质量控制的流程中，属于接受委托环节的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","聘用专家",false,{"key":16,"text":17,"correct":14},"B","选任项目经理",{"key":19,"text":20,"correct":14},"C","组建项目评估组",{"key":22,"text":23,"correct":24},"D","指派项目前期负责人",true,"⒈接受委托 工程咨询机构接受政府、企业或金融机构的委托，指派项目前期负责人，负责前期洽商、谈判、合同评审等工作。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]