[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-941065":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},941065,608,2,"多选题","政府和社会资本合作(PPP)项目财政承受能力论证工作包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","财政承受能力评估",true,{"key":16,"text":17,"correct":18},"B","政府机构能力评估",false,{"key":20,"text":21,"correct":14},"C","责任识别和支出测算",{"key":23,"text":24,"correct":18},"D","竞争性中立调整测算",{"key":26,"text":27,"correct":18},"E","全生命周期整合程度评估","AC","㈡财政承受能力论证 ⒈责任识别和支出测算 PPP 项目全生命周期过程的财政支出责任，主要包括股权投资、运营补贴、风险承担、配套投入等。 ⒉财政承受能力评估 财政承受能力评估，包括财政支出能力评估以及行业和领域平衡性评估",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]