[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940908":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},940908,608,2,"多选题","某生产性项目所用的原材料属于稀缺品种，则供应方案选择时应考虑的主要因素有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","原材料的质量和性能",true,{"key":16,"text":17,"correct":14},"B","原材料的需求量",{"key":19,"text":20,"correct":14},"C","原材料来源的可靠性",{"key":22,"text":23,"correct":14},"D","原材料来源的性",{"key":25,"text":26,"correct":27},"E","原材料生产工艺的先进性",false,"ABCD","原材料供应方案选择考虑的主要因素：⑴原材料的品种、质量、性能。⑵原材料需求量。⑶原材料供应必须进行多种方案比较。原料来源必须明确、可靠。⑷对于稀缺的原料还应分析原料来源的风险和性。⑸涉及原料进口的项目，若存在进口配额、贸易权限等法律规定，应当予以说明和分析。",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]