[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940849":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},940849,608,1,"单选题","工程和配套方案与项目的技术方案和设备方案以及()选择形成互为条件，也是投资估算和经济分析的重要基础，是影响项目环境、安全等以及经济合理性的重要因素。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设规模和产品方案",true,{"key":16,"text":17,"correct":18},"B","总图运输和装备方案",false,{"key":20,"text":21,"correct":18},"C","财务分析和风险分析",{"key":23,"text":24,"correct":18},"D","建设条件与场址","㈥工程方案及配套工程方案 工程和配套方案是在技术方案和设备方案确定的基础上，围绕着工艺生产装置在建筑、结构、上下水、供电、供热、维修、服务等进行系统配套与完善，形成完整的运行体系。 工程和配套方案与项目的技术方案和设备方案以及建设规模和产品方案选择形成互为条件，也是投资估算和经济分析的重要基础，是影响项目环境、安全等以及经济合理性的重要因素",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]