[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940847":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},940847,608,2,"多选题","在研究确定()的同时，要明确项目所需主要原材料和燃料的品种、数量、规格、质量的要求，对价格进行分析研究，并结合场址方案的比选确定其供应方案。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建设规模",true,{"key":16,"text":17,"correct":18},"B","总图运输",false,{"key":20,"text":21,"correct":14},"C","产品方案",{"key":23,"text":24,"correct":18},"D","建设条件",{"key":26,"text":27,"correct":14},"E","工艺技术方案","ACE","",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]