[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940844":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},940844,608,1,"单选题","改、扩建和技术改造项目需要了解或估算五套。其中，“有项目”投资是指“有项目”时，拟建项目范围内的()加上项目范围内可利用的原有固定资产价值之和。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","“现状”数据",false,{"key":16,"text":17,"correct":18},"B","“新增”投资",true,{"key":20,"text":21,"correct":14},"C","“无项目”投资",{"key":23,"text":24,"correct":14},"D","“增量”投资","",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]